A Method of Quickly Testing the Function of Power Management Bus
A technology for testing power supply and bus management, applied in electrical components, digital transmission systems, data exchange networks, etc., can solve the problem that it is difficult for people who are unfamiliar with Linux systems to test, so as to save test costs, widen application prospects, and reduce technology. and the effect of knowledge requirements
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] A method for quickly testing the power management bus function provided by Embodiment 1 includes the following steps:
[0032] The confirmation module confirms the executed parameter value;
[0033] The query module queries the current power of the power management bus, obtains the return value, and transmits it to the first conversion module, and the first conversion module converts the obtained return value into a binary system and transmits it to the display module for display;
[0034] The write module writes the maximum power value, the power limit module sets the power limit value, and the second conversion module performs binary conversion on the set limit power value, and executes the power limit strategy if the conversion is successful;
[0035] The query module obtains the current power limit value, and transmits it to the first conversion module, and the first conversion module converts the obtained power limit value into a system and transmits it to the disp...
Embodiment 2
[0050] Embodiment 2 provides a method for quickly testing the power management bus function, and the specific implementation process is as follows:
[0051] Realize remote machine power management bus pmbus function test:
[0052] (1) Execute . / pmus –r and enter the remote bmc ip
[0053] [root@ml Desktop]# . / pmbus-r
[0054] Enter the ip-addr:100.2.37.17
[0055] 1. Query current power
[0056] 2.Limit power
[0057] 3. Query power limit
[0058] 4. Cancel powei limit
[0059] -. Enter 'exit' to quit!
[0060] Enter the number of action you want to execute:
[0061] (2) Query the current total power, input 1 to get the current power
[0062]Enter the number of action you want to execute: 1
[0063] Current power is 115 W!
[0064] (3) Power limit, select mode 2, input the maximum power, automatically calculate the base conversion, and limit the power to 80%
[0065] Enter the number of action you want to execute: 2
[0066] Please enter your max total-power in 10 ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
