Unlock instant, AI-driven research and patent intelligence for your innovation.

Installation device and installation method of prefabricated ring beam and well seat for municipal road inspection well

A technology for municipal roads and installation devices, which is used in construction, artificial islands, infrastructure projects, etc., can solve the problems of inconvenient weight handling, low efficiency, and difficult adjustment, shortening the construction period, saving engineering costs, and improving installation quality. Effect

Active Publication Date: 2019-04-02
CHINA 22MCC GROUP CORP
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] The prefabricated ring beam and well base of the traditional inspection well are installed by manual handling and installation. Due to the heavy weight of the prefabricated ring beam and well base of the inspection well (each prefabricated ring beam and well base is about 100 kg), it is not easy to carry ), and the well base is installed in the recess of the prefabricated ring beam, it needs to be adjusted repeatedly, the adjustment is very difficult, there may be safety problems such as pinching fingers, and there is no better protection measure, this method of construction is not only inefficient but also cannot guarantee installer safety

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Installation device and installation method of prefabricated ring beam and well seat for municipal road inspection well
  • Installation device and installation method of prefabricated ring beam and well seat for municipal road inspection well
  • Installation device and installation method of prefabricated ring beam and well seat for municipal road inspection well

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0052] The present invention is described in detail below with reference to accompanying drawing and embodiment:

[0053] attached figure 1 It can be known that a municipal road inspection well prefabricated ring beam and well seat installation device,

[0054] Including support frame and hoisting fixture 12;

[0055] Described bracing frame comprises left side triangular bracing frame 1 and right side triangular bracing frame 2;

[0056] The tops of the left triangle support frame 1 and the right triangle support frame 2 are connected by a support beam 3;

[0057] The lower parts of the left side triangle support frame 1 and the right side triangle support frame 2 are respectively provided with support seats 4;

[0058] Rollers 5 are arranged on both sides of the support base 4;

[0059] The hoisting fixture includes a limit disc 6;

[0060] A lifting lug 7 is provided at the center of the upper surface of the limit disc 6;

[0061] The lower surface of the limiting dis...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a municipal administration path inspection well prefabricated ring beam and well base installing device and method. A support frame and a hoisting clamp are included; a inspection well prefabricated ring beam and a well base which need to be installed are transported to be in place; the support frame and a wire grip are connected, and the wire grip is connected with threeropes; the lower end of a limiting claw of the hoisting clamp is connected with the lower ends of the three ropes; the hoisting clamp is inserted in from the position above the prefabricated ring beamand the well base; the wire grip is fastened, and the prefabricated ring beam and the well base are hoisted to be transported to the position above the design position; and the wire grip is loosenedto enable the prefabricated ring beam and the well base to be in place. According to the municipal administration path inspection well prefabricated ring beam and well base installing device and method, the length of a steel wire rope of the wire grip is adjusted, the inclination direction and angle of the well base are changed, a transverse slope and a vertical slope of the well base of an inspection well are adjusted, accurate installation of the well base of the prefabricated inspection well is achieved, the working strength of a construction person is effectively reduced, the safety of theconstruction person is guaranteed, the construction period is shortened, and the installing quality of the prefabricated ring beam and the well base of the prefabricated inspection well is improved.

Description

technical field [0001] The invention relates to a building construction method, in particular to a prefabricated ring beam and well seat installation device and installation method of a municipal road inspection well. Background technique [0002] The prefabricated ring beam and well seat of the traditional inspection well are installed by manual handling and installation. Because the prefabricated ring beam and well seat of the inspection well are relatively heavy (each prefabricated ring beam and well seat is about 100 kg) and smooth structures (it is not easy to carry ), and the well base is installed in the recess of the prefabricated ring beam, it needs to be adjusted repeatedly, the adjustment is very difficult, there may be safety problems such as pinching fingers, and there is no better protection measure, this method of construction is not only inefficient but also cannot guarantee Installer safety. Contents of the invention [0003] Aiming at the deficiencies in...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D29/12
CPCE02D29/12
Inventor 袁星杜显宗于庭富
Owner CHINA 22MCC GROUP CORP