Intelligent tunnel construction measurement setting-out method based on BIM (Building Information Modeling)

A technology for construction surveying, surveying and lofting, which is used in surveying devices, surveying instruments, surveying and mapping and navigation, etc., and can solve problems such as over- and under-excavation

Inactive Publication Date: 2018-03-20
NO 1 CONSTR ENG CO LTD OF CHINA CONSTR THIRD ENG BUREAU CO LTD
View PDF6 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The traditional measurement error is affected by the experience of the operator, often resulting in over and under digging beyond the specification

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Intelligent tunnel construction measurement setting-out method based on BIM (Building Information Modeling)

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0021] It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

[0022] In this preferred embodiment, a method for surveying and setting out of tunnel intelligent construction based on BIM comprises the following steps:

[0023] Step S10, create a tunnel excavation BIM model according to the drawings, and copy the created BIM model to the BIM mobile terminal after format conversion, and the BIM mobile terminal is equipped with BIM-based tunnel intelligent measurement and stakeout system software;

[0024] Step S20, after the smart total station is in place at the measurement and stakeout site, use the BIM mobile terminal to connect to the smart total station, set the measurement parameters through the BIM mobile terminal and control the smart total station to complete the connection and lock, using infrared prism-free carry out measurement and stakeout;

[0025] Step S30, after se...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses an intelligent tunnel construction measurement setting-out method based on BIM (Building Information Modeling). The method comprises the following steps: establishing a tunnelexcavation BIM model according to drawings, performing format conversion on the established BIM model, and copying to a BIM mobile station; after intelligent total station in-place operation is completed on a measurement setting-out site, connecting the BIM mobile station with an intelligent total station, setting measurement parameters through the BIM mobile station, and controlling the intelligent total station to complete connection and locking, and performing measurement setting-out by using an infrared non-prism; and after a testing station is set up, measuring any point on an excavationsurface, confirming a general distance of the excavation surface, automatically calculating the position of a setting-out point at the mileage by the BIM mobile station, and automatically searching anactual setting-out point at the cross part of the BIM model and the excavation surface front and back, thereby achieving automatic setting-out. By adopting the intelligent tunnel construction measurement setting-out method based on BIM, setting-out in the tunnel construction process can be accurately and conveniently implemented.

Description

technical field [0001] The invention relates to the technical field of building construction stakeout, in particular to a BIM (Building Information Modeling, Building Information Modeling)-based tunnel intelligent construction measurement stakeout method. Background technique [0002] Tunnel excavation measurement stakeout is different from other structure stakeouts. It uses interval points to draw the position of the surrounding blasthole line on the excavation section. Because the actual excavation section of the tunnel is not a flat plane, the excavation section and stakeout points The mileage is not on the same mileage, so the stakeout point cannot be calculated in advance, and the actual stakeout point needs to be found before and after the mileage after calculation based on the calculated point. [0003] In traditional stakeout, one can only roughly estimate an excavation mileage according to the excavation section, and calculate according to the estimated mileage. Aft...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G01C15/00
Inventor 高波张晓俊钱叶存张弓梅支耀陈杰烽冯轲
Owner NO 1 CONSTR ENG CO LTD OF CHINA CONSTR THIRD ENG BUREAU CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products