Converter and rocking furnace fault control method and system
A control method and control system technology, which is applied in the field of iron and steel smelting, can solve problems such as the failure of the converter to operate normally and the accidental pouring of molten steel, and achieve the effects of ensuring production efficiency and product quality, reducing accidental pouring, and improving safety
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036] The application provides a control method for a converter shaker failure, including:
[0037] Step SA1: collecting the tapping signal, the slagging signal and the converter shaking speed signal;
[0038] Step SA2: collecting the converter tilting angle signal;
[0039] Step SA3: When the steel tapping signal and the slag discharging signal appear simultaneously, control the converter to only execute the steel tapping command or the slag discharging command according to the converter tilting angle signal.
[0040] Step SA4: When the steel tapping signal or the slag tapping signal appears independently, the converter speed signal is given, and the motor torque reaches a set value, the brake is opened.
[0041] Wherein, in step SA3, when the tapping signal and the slagging signal appear simultaneously, controlling the converter to only execute the tapping command or the slag tapping command according to the converter tilting angle signal includes:
[0042] SA31: When the...
Embodiment 2
[0050] The difference between this embodiment and Embodiment 1 is that the signal processing device uses a programmable logic controller (hereinafter referred to as PLC). Before the PLC is put into use, the specific operations are as follows:
[0051] Step C1: The master controller performs testing of steel tapping, slag tapping, and speed signals, and sends them to the PLC.
[0052] Step C2: Write the logic relationship of the contacts of the brake, frequency converter speed, closing, start and stop, tilting angle and master command.
[0053] Step C3: Write PLC program.
[0054] Step C4: On-site commissioning tests, especially tests at various angles and various operating states.
[0055] Step C5: Complete the debugging and put the program into use.
[0056] Among them, when the steel tapping and slag tapping signals appear at the same time, the tilting angle of the converter is between 2 and 180 degrees, and the PLC program controls the converter 10HZ to return to the vert...
Embodiment 3
[0064] This embodiment provides a control system for a converter shaker failure, including:
[0065] Controller, encoder, signal processing device and frequency converter; Among them, the controller is used to collect the steel tapping signal, slag discharging signal and shaking furnace speed signal, and transmit the steel tapping signal, slag discharging signal and shaking furnace speed signal to the signal processing device; the encoder is used to collect the converter tilting angle signal, and transmits the converter tilting angle signal to the signal processing device; the signal processing device is used to simultaneously receive the tapping signal and the slag signal, according to The converter tilting angle signal obtains the control signal to the converter, and transmits the control signal to the frequency converter; the frequency converter is used to receive the control signal, and controls the converter to only execute the steel tapping command or the slag discharging...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


