Eureka AIR delivers breakthrough ideas for toughest innovation challenges, trusted by R&D personnel around the world.

A method and device for determining the timing of limiting sand discharge in gas wells

A gas well and sand removal technology, which is applied in earthwork drilling, wellbore/well components, measurement, etc., can solve problems such as gas well scrapping, gas well natural gas production reduction, and gas well sand accumulation that cannot be discharged, so as to avoid sand plugging and gas well shutdown well effect

Active Publication Date: 2021-03-30
PETROCHINA CO LTD
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] However, the timing of implementing sand removal measures is generally affected by factors such as the degree of sand accumulation in the gas well, the size of sand grains, the production of natural gas, and the average pressure of the gas reservoir. When the sand height reaches a certain level, the sand accumulation in the gas well cannot be discharged by relying on the energy of the natural gas in the gas reservoir. As the sand accumulation height gradually increases, the natural gas production of the gas well gradually decreases, until the sand is blocked and the well is shut down, causing the gas well to be scrapped

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A method and device for determining the timing of limiting sand discharge in gas wells
  • A method and device for determining the timing of limiting sand discharge in gas wells
  • A method and device for determining the timing of limiting sand discharge in gas wells

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0058] In order to enable those skilled in the art to better understand the technical solutions in the present application, the technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described The embodiments are only some of the embodiments of the present application, but not all of them. Based on the embodiments in this application, all other embodiments obtained by persons of ordinary skill in the art without creative efforts shall fall within the scope of protection of this application.

[0059] refer to figure 1 As shown, the method for determining the timing of gas well limit sand discharge in the embodiment of the present application may include:

[0060] S101. Obtain the basic parameters of the target gas well and reservoir, gas flow rate and wellhead oil pressure.

[0061] In some embodiments of the present applicat...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The embodiment of the invention provides a method and device for determining the ultimate sand-discharging occasion of a gas well. The method comprises the steps that basic parameters, gas flowing rates and wellhead oil pressure of the target gas well and a reservoir are obtained; according to the basic parameters, the gas flowing rates and the wellhead oil pressure, the height of accumulated sandin a production pipe column of the target gas well is determined; the first relation between the wellhead oil pressure and the height of the accumulated sand is determined; according to the basic parameters and wellhead static pressure data of the target gas well, the maximum height of the accumulated sand capable of being discharged from the production pipe column under different wellhead staticpressure is determined; according to the maximum height of the accumulated sand and the first relation, the second relation between the maximum height of the accumulated sand and the wellhead oil pressure is determined; and the ultimate sand-discharging occasion of the target gas well is determined according to the second relation. The accuracy of determining the ultimate sand-discharging occasion of the gas well can be improved.

Description

technical field [0001] The application belongs to the technical field of petroleum and natural gas development, and in particular relates to a method and device for determining the timing of limiting sand discharge in a gas well. Background technique [0002] Fractured tight sandstone gas reservoirs refer to gas reservoirs with well-developed natural fractures, low matrix porosity and poor permeability. This type of gas reservoir is generally characterized by high temperature, high pressure, and high yield, and currently faces the problem of sand production in gas wells. However, after sand production in gas wells, it is easy to accumulate in the production string, which seriously affects the production of natural gas. Therefore, sand removal measures are required for sand production gas wells in order to remove the sand accumulation at the bottom of the well and restore the natural gas production of the gas well. [0003] However, the timing of implementing sand removal me...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21B47/00E21B47/06
CPCE21B47/00E21B47/06
Inventor 常宝华崔永平孙贺东张建业曹雯陈宝新刘磊
Owner PETROCHINA CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products