A Method for Evaluation of Rail Transit Emergency Plan
An emergency plan, rail transit technology, applied in the field of emergency management to achieve the effect of improving accuracy, increasing reliability and effectiveness
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0070] The technical solutions of the present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0071] Step1. Selection of evaluation indicators
[0072] The emergency preparedness capability, risk analysis capability, event warning capability, emergency response capability and aftermath disposal capability are selected as the input indicators of the rail transit emergency plan evaluation model; the direct economic losses caused by the event, the execution time of the plan and the impact of the event on passenger flow are selected as the output indicators .
[0073] Step2, data statistics and processing
[0074] Select some emergency plans of a rail transit operating company as the evaluation object, and set the number of emergency plans n=10.
[0075] For the input index data, set the number of evaluators m = 10, and organize the evaluators to score each element of the selected emergency plan under the condit...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


