CRTS II slab-type ballastless track mortar bonding quality detection equipment and method
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- 铁科检测有限公司
- Publication Date
- 2018-07-31
Smart Images

Figure 1 
Figure 2
Abstract
Description
technical field
[0001] The invention relates to the technical field of quality and safety detection during operation of CRTS II slabs on high-speed railways, in particular to a CRTS II slab ballastless track mortar bonding quality detection device and method. Background technique
[0002] At present, the mileage of high-speed railways put into operation in my country has exceeded 20,000 kilometers. By the end of 2016, the total mileage of the CRTS Ⅱ slab ballastless track slab main line was nearly 10,000 kilometers, accounting for more than 40% of the total mileage of high-speed railway ballastless track lines. . The effective bonding between the track slab and the mortar layer guarantees the limit of the track slab, supports and transmits the vertical load, coordinates the displacement and transmits the horizontal load, so the mortar layer is an important part of the CRTSⅡ slab ballastless track system. Under the action of external factors such as train impact load, tempera...