The construction method of prestress staged stretching based on the elimination of concrete creep
A construction method and prestressing technology, applied in construction, bridge construction, bridges, etc., can solve problems such as structural overload, traffic congestion, and inability to implement, to reduce creep, eliminate creep deformation, and reduce creep deformation. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] In order to have a clearer understanding of the technical features, purposes and effects of the present invention, the specific implementation manners of the present invention will now be described in detail with reference to the accompanying drawings.
[0020] Such as figure 1 Shown, in the construction method of the prestress staged stretching based on eliminating concrete creep of the present invention, may further comprise the steps:
[0021] S1. Obtain the relationship diagram between concrete creep deformation and loading age. According to the creep calculation theory, the creep deformation under the action of unit stress is the creep function, and its calculation formula is as follows:
[0022]
[0023] According to the creep calculation formula, continuously changing the variable values of time parameters such as loading age can be substituted into the empirical creep calculation formula to obtain concrete under different loading ages (that is, the creep f...