A kind of copper plate edge burr grinding equipment
A copper plate and equipment technology, applied in the field of copper plate edge burr grinding equipment, can solve the problems of hurting hands, slow grinding of copper plate edge burrs, etc., and achieve the effect of preventing movement
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] A kind of copper plate edge deburring equipment, such as Figure 1-6 As shown, it includes a mounting frame 1, a backing plate 2, a pole 4, a first nut 5, a first bolt 6, a crank handle 7, a mounting plate 8, a motor 9, a rotating shaft 10, a gear 11, a screw rod 12, and a second nut 13. Pressing block 14, first guide sleeve 15, rack 16 and grinding stone 17, a strut 4 is provided on the inner right side of the lower wall of the mounting frame 1, and the top of the strut 4 is connected with a first nut 5, and the inside of the first nut 5 The first bolt 6 is screwed, the left end of the first bolt 6 is connected with a briquetting block 14, the right end of the first bolt 6 is connected with a rocker 7, the lower part of the left wall of the mounting frame 1 is provided with a backing plate 2, and the backing plate 2 and the briquetting block 14 A copper plate body 3 is placed on the inner side of the lower wall of the mounting frame 1, two mounting plates 8 are arrange...
Embodiment 2
[0028] A kind of copper plate edge deburring equipment, such as Figure 1-6As shown, it includes a mounting frame 1, a backing plate 2, a pole 4, a first nut 5, a first bolt 6, a crank handle 7, a mounting plate 8, a motor 9, a rotating shaft 10, a gear 11, a screw rod 12, and a second nut 13. Pressing block 14, first guide sleeve 15, rack 16 and grinding stone 17, a strut 4 is provided on the inner right side of the lower wall of the mounting frame 1, and the top of the strut 4 is connected with a first nut 5, and the inside of the first nut 5 The first bolt 6 is screwed, the left end of the first bolt 6 is connected with a briquetting block 14, the right end of the first bolt 6 is connected with a rocker 7, the lower part of the left wall of the mounting frame 1 is provided with a backing plate 2, and the backing plate 2 and the briquetting block 14 A copper plate body 3 is placed on the inner side of the lower wall of the mounting frame 1, two mounting plates 8 are arranged...
Embodiment 3
[0031] A kind of copper plate edge deburring equipment, such as Figure 1-6 As shown, it includes a mounting frame 1, a backing plate 2, a pole 4, a first nut 5, a first bolt 6, a crank handle 7, a mounting plate 8, a motor 9, a rotating shaft 10, a gear 11, a screw rod 12, and a second nut 13. Pressing block 14, first guide sleeve 15, rack 16 and grinding stone 17, a strut 4 is provided on the inner right side of the lower wall of the mounting frame 1, and the top of the strut 4 is connected with a first nut 5, and the inside of the first nut 5 The first bolt 6 is screwed, the left end of the first bolt 6 is connected with a briquetting block 14, the right end of the first bolt 6 is connected with a rocker 7, the lower part of the left wall of the mounting frame 1 is provided with a backing plate 2, and the backing plate 2 and the briquetting block 14 A copper plate body 3 is placed on the inner side of the lower wall of the mounting frame 1, two mounting plates 8 are arrange...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


