Shield knife replacing diaphragm wall reinforcing structure and reinforcing construction method
A technology for strengthening structures and construction methods, which is applied to foundation structure engineering, sheet pile walls, earthwork drilling and mining, etc. It can solve the problems of high requirements for operators, many processes, and high risks, and achieve low cost, personal safety, and construction period. short effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0056] Such as figure 1 , figure 2 and image 3 As shown, the ground wall reinforcement structure for shield machine tool change includes the ground wall 1 arranged on the tunnel excavation route. The ground wall 1 is a plain concrete ground wall. The ground connecting wall 1 is arranged at the tool changing position of the excavation route.
[0057] During the excavation process of the shield machine, with the advancement of the excavation depth, the tool wear becomes more and more serious. After the excavation of the shield machine, the tool needs to be changed. The distance of the tool change is within a certain interval length, which can be judged based on experience. The wear amount of the tool, and then determine the tunneling length of the shield machine for tool replacement, so as to determine the position where the tool is changed after the shield machine is driven, so determine the tool change position, and the ground connection wall is set at this position, so th...
Embodiment 2
[0068] Such as figure 1 , figure 2 , image 3 and Figure 4 As shown, the reinforcement construction method of the ground connection wall of the shield machine tool change, when arranging the reinforcement structure of the shield machine tool change ground connection wall as in Example 1, proceed according to the following construction steps:
[0069] a. Preset the opening position, predict the wear amount of the shield tool according to the construction stratum and shield tunneling parameters, and determine the position where the shield machine 3 needs to change the tool, so as to preset the opening position on the shield machine 3;
[0070] b. The construction of the ground connection wall 1 is carried out at the position where the tool is changed after the shield machine 3 is excavated, and the construction of the ground connection wall 1 is carried out on the tunnel excavation route;
[0071] c. Shut down after the shield machine 3 is excavated in place, and stop after...
PUM
Property | Measurement | Unit |
---|---|---|
Length | aaaaa | aaaaa |
Width | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com