Simulation test device and simulation method for construction process of deep water mooring body
A process simulation and test device technology, applied in hydraulic models, hydraulic engineering, hydraulic engineering equipment, etc., can solve the problems that the laboratory simulation of new deep-water mooring bodies cannot be realized, and achieve the effect of compact structure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0024] In order to make the above-mentioned features and advantages of the present invention more comprehensible, the following specific embodiments are described in detail with reference to the accompanying drawings, but the present invention is not limited thereto.
[0025] refer to Figure 1 to Figure 4
[0026] A deep-water mooring body construction process simulation test device, including a test box 1, a seabed simulation system 2 is arranged in the test box, and a water pressure for applying water pressure to the test box to simulate a deep sea pressure environment is arranged outside the test box Control system 3, the top of the test chamber is provided with an extension part 11 extending upwards to form a downward penetration space 12, and the top of the extension part is provided with an anchor body 4 having a slurry inlet, a slurry passage and a slurry outlet, extending An anchor body release system 5 for releasing the anchor body is also provided on the top of the...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com