Prefabricated concrete shear wall and in-plane beam rigid connection joint and construction method thereof

A concrete shear wall and rigid connection technology, which is applied in the direction of walls, building components, buildings, etc., can solve problems such as the difficulty of rigidly connecting joints between prefabricated concrete shear walls and in-plane beams, and achieve simplified construction procedures, accurate positioning, The Effect of Simplifying Complexity

Pending Publication Date: 2018-09-14
SHANGHAI INST OF TECH
View PDF7 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0008] The purpose of the present invention is to provide a rigid connection node between a prefabricated concrete shear wall and an in-plane beam and a construction method, which is easy to construct and has excellent mechanical properties at the connection, so as to solve the rigid connection between the prefabricated concrete shear wall and an in-plane beam difficult question

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Prefabricated concrete shear wall and in-plane beam rigid connection joint and construction method thereof
  • Prefabricated concrete shear wall and in-plane beam rigid connection joint and construction method thereof
  • Prefabricated concrete shear wall and in-plane beam rigid connection joint and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0045] The following will combine Figure 1 to Figure 5 The rigid connection node of the fabricated concrete shear wall and the in-plane beam provided by the present invention is described in detail. This embodiment is implemented on the premise of the technical solution of the present invention, and a detailed implementation mode and specific operation process are given. However, the protection scope of the present invention is not limited to the following embodiments, and those skilled in the art can modify and polish it without changing the spirit and content of the present invention.

[0046] Please refer to Figure 1 to Figure 5 , A rigid connection node between a fabricated concrete shear wall and an in-plane beam, comprising a concrete shear wall 10 and a concrete in-plane beam 30, the end of the shear wall 10 and the end of the in-plane beam 30 pass between H-shaped steel 20 is fixedly connected. The specific structure is as follows:

[0047] The rigid connection node of...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a prefabricated concrete shear wall and in-plane beam rigid connection joint and a construction method thereof. The prefabricated concrete shear wall and in-plane beam rigid connection joint comprises a shear wall and an in-plane beam. The end of the shear wall and the end of the in-plane beam are fixedly connected through H-shaped steel. Preferably, the prefabricated concrete shear wall and in-plane beam rigid connection joint further comprises a shear wall interior pre-embedded steel plate and a beam interior pre-embedded steel plate. The shear wall interior pre-embedded steel plate is fixedly arranged at the end of the shear wall, and the beam interior pre-embedded steel plate is fixedly arranged at the end of the in-plane beam. The shear wall interior pre-embedded steel plate and the beam interior pre-embedded steel plate are fixedly connected through H-shaped steel. According to the technical scheme, the problem that a prefabricated concrete shear wall andin-plane beam rigid connection joint is difficult to form is solved.

Description

Technical field [0001] The invention relates to the technical field of node connection of prefabricated building structures, in particular to a rigid connection node of a prefabricated concrete shear wall and an in-plane beam and a construction method. Background technique [0002] With the rapid development of our country's economy, people's living standards are continuously improving, and the requirements for housing are increasing. At the same time, the cast-in-place construction method of residences is not compatible with my country's sustainable development concept. At present, my country urgently needs to solve the problems of high energy consumption, high pollution and high investment in residential construction. Therefore, the Ministry of Housing and Urban-Rural Development of the National Development and Reform Commission of my country issued the "Green Building Action Plan", which clearly mentions the promotion of prefabricated assembly suitable for industrialized produ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E04B2/56E04B1/38E04G21/00
CPCE04B2/56E04G21/00E04B1/388
Inventor 吴志平胡大柱王丹陈欣宇
Owner SHANGHAI INST OF TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products