Filling equipment for petroleum pipeline burying
A technology for oil pipelines and equipment, applied in the field of filling equipment for oil pipeline burial, can solve the problems of low labor intensity, dust affecting the environment, high labor intensity, etc., and achieve the effect of low labor intensity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0021] A kind of earth filling equipment for buried oil pipeline, such as Figure 1-3 As shown, it includes base plate 1, big wheel 2, 7-shaped plate 3, first motor 4, first bearing seat 5, screw mandrel 6, nut 7, mounting plate 8, first pulley 9, second pulley 10, flat Belt 11, second motor 12, disc 13, ball 15, connecting rod 16, connecting rod 17, u-shaped block 18, push plate 19, roller 20, guide rod 21, guide sleeve 22, L-shaped bar 23 and the first Two bearing blocks 37, the base plate 1 bottom is equipped with a large wheel 2, the left side of the base plate 1 top is connected with a 7-shaped plate 3, and the top of the 7-shaped plate 3 inner side is equipped with a first motor 4 and a second bearing block 37, and the second bearing block 37 Located on the right side of the first motor 4, first bearing seats 5 are installed on the left and right sides of the top of the 7-shaped plate 3, and the two first bearing seats 5 are all located on the right side of the 7-shaped ...
Embodiment 2
[0023] A kind of earth filling equipment for buried oil pipeline, such as Figure 1-3As shown, it includes base plate 1, big wheel 2, 7-shaped plate 3, first motor 4, first bearing seat 5, screw mandrel 6, nut 7, mounting plate 8, first pulley 9, second pulley 10, flat Belt 11, second motor 12, disc 13, ball 15, connecting rod 16, connecting rod 17, u-shaped block 18, push plate 19, roller 20, guide rod 21, guide sleeve 22, L-shaped bar 23 and the first Two bearing blocks 37, the base plate 1 bottom is equipped with a large wheel 2, the left side of the base plate 1 top is connected with a 7-shaped plate 3, and the top of the 7-shaped plate 3 inner side is equipped with a first motor 4 and a second bearing block 37, and the second bearing block 37 Located on the right side of the first motor 4, first bearing seats 5 are installed on the left and right sides of the top of the 7-shaped plate 3, and the two first bearing seats 5 are all located on the right side of the 7-shaped p...
Embodiment 3
[0026] A kind of earth filling equipment for buried oil pipeline, such as Figure 1-3 As shown, it includes base plate 1, big wheel 2, 7-shaped plate 3, first motor 4, first bearing seat 5, screw mandrel 6, nut 7, mounting plate 8, first pulley 9, second pulley 10, flat Belt 11, second motor 12, disc 13, ball 15, connecting rod 16, connecting rod 17, u-shaped block 18, push plate 19, roller 20, guide rod 21, guide sleeve 22, L-shaped bar 23 and the first Two bearing blocks 37, the base plate 1 bottom is equipped with a large wheel 2, the left side of the base plate 1 top is connected with a 7-shaped plate 3, and the top of the 7-shaped plate 3 inner side is equipped with a first motor 4 and a second bearing block 37, and the second bearing block 37 Located on the right side of the first motor 4, first bearing seats 5 are installed on the left and right sides of the top of the 7-shaped plate 3, and the two first bearing seats 5 are all located on the right side of the 7-shaped ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


