A Group Sequential Scheduling Method for Air-Conditioning Load Groups to Provide Spinning Reserve
A technology of air conditioning load and spinning reserve, applied in data processing applications, instruments, power network operating system integration, etc., can solve problems such as rapid power recovery, limiting the maximum duration of air conditioning load spinning reserve, and rebounding.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0075] Further description will be made below in conjunction with the embodiments and accompanying drawings.
[0076] Such as figure 1 Shown, the inventive method comprises:
[0077] 1) Establish an aggregation model for all the air-conditioning loads that can be dispatched. In the aggregation model: divide all the air-conditioning loads that can be dispatched into multiple groups of air-conditioning loads, and sort them in sequence, and build a single air-conditioning load working model with subordinate The aggregated power P of the air conditioning load group in the state g and the subordinate state vector S of the air-conditioning load group g ; and use the temperature adjustment value vector γ of all air-conditioning loads at the scheduling time Adjust the set temperature of the air-conditioning loads in the air-conditioning load group to provide spinning reserve, using the aggregated power P g Calculate the reserve capacity RC of the air conditioning load group in th...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


