Fish-scale pit soil preparation and forestation method
A fish scale pit and fish scale plate technology, which is applied in afforestation, forestry, climate change adaptation, etc., can solve the problems of strong erosion, sparse vegetation, and difficulty in ecological construction and ecological restoration, and achieves low cost, simple method, and reduced soil erosion. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0015] The fish scale pit site preparation and afforestation method of the present invention is to excavate several rows of crescent-shaped pits at intervals from top to bottom on the mountain or slope. Each crescent-shaped pit is 1.2 meters long, 0.5 meters wide, and 10-20 cm deep. , The bottom surface of each pit is lower than the original slope surface, the groove edges on both sides of each row of crescent-shaped pits extend outward based on the contour line, and the two adjacent rows of crescent-shaped pits are staggered. It is arranged so that the three adjacent crescent-shaped pits in the upper and lower rows are arranged in a "pin" shape, and the adjacent crescent-shaped pits in the upper and lower rows overlap each other to improve the utilization rate of runoff. After digging, fix a fish scale made of shrubs on the outer side of each crescent-shaped pit away from the slope surface. The fish scale is buried in the crescent-shaped pit to a depth of 10-20cm and fixed, and...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More