A heavy road pier used in municipal engineering
An engineering and heavy-duty technology, applied in the direction of roads, roads, road safety devices, etc., can solve the problems of no structure, increased moving costs, unfavorable road pier management, etc., and achieve good use effect and simple structure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach
[0047]Specific implementation method: when the manager of the road pier needs to move the pier, the sleeve 10 matching the pier is placed on the swing rod 12, and the sleeve 10 is twisted clockwise with both hands, and the trigger block 11 rotates together with the sleeve 10; The trigger block 11 is in contact with the arc block 25 and presses the arc block 25, and the return spring 26 is compressed; the arc block 25 drives the limit bar 23 to move downward together through the connection block 24; the limit bar 23 breaks away from the first limit notch 15; then both hands push the casing 10 to drive the swing rod 12 to swing along the central axis of the circular rod groove 4; the swing rod 12 drives the rotating rod 13 to rotate together; the rotating rod 13 drives the reversing wheel 18 around the axis of the rotating rod 13 Swing; continue to push the sleeve pipe 10 until the sleeve pipe 10 swings to the other side of the right-angled triangular groove 2, at this moment, th...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 