A reinforcement structure and reinforcement method for shield tunneling in boulder strata to cross rivers
A technology for crossing rivers and reinforcing structures, which is applied in earthwork drilling, mining equipment, tunnels, etc. It can solve the problems of shield tunnel construction hazards, fast penetration of rich water, and low safety, so as to reduce irreversible damage and prevent river water backflow , the effect of shortening the reinforcement length
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Publication Date
- 2020-05-29
Smart Images

Figure 1 
Figure 2
Abstract
Description
technical field
[0001] The invention relates to a subway shield tunnel construction technology, in particular to a reinforcement structure and a reinforcement method for a shield tunnel crossing a river in a boulder stratum. Background technique
[0002] In recent years, with the continuous improvement of domestic shield tunneling technology, the shield tunneling method has shown strong advantages and has been applied more and more. However, when planning subway lines, it is inevitable that shield tunneling will cross natural canals and river courses. At present, various ground grouting reinforcement methods for river courses have the disadvantages of destroying the original stratum of the river bottom, long construction period, low safety, high cost, etc., and the surrounding environment is complex, making it difficult to implement. However, the boulder stratum has rich water, fast penetration, weak cementation, and poor self-stability. If there is a little careless contro...
Examples
Embodiment Construction
[0026] The present invention is further described below in conjunction with accompanying drawing.
[0027] like figure 1 , 2 As shown, a reinforcement structure for shield tunneling across rivers in drifting pebble strata, including U-shaped trough box (1), U-shaped trough box (1) culvert bottom and inner side welded with channel steel keel (7), The U-shaped trough box (1) and the top of the shaped steel keel (7) are laid with section steel and walkway slabs to lay the work platform (5), and the culvert bottom of the U-shaped trough box (1) is welded with the reserved grouting pipeline perpendicular to the bottom of the trough ( 6), the water level monitoring device (3) is arranged on the reserved grouting pipeline (6), and steel wire mesh, geotechnical waterproof cloth and A soft isolation device (4) composed of colored strips of cloth.
[0028] The U-shaped groove box (1) is a processing and welding tool, which is welded by 5mm thick steel plate + 14 channel steel. The bo...