Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

11results about How to "Avoid Secondary Disasters" patented technology

Blasting roof-cutting pressure relief method for lateral stress peak position of wide coal pillar

The invention discloses a wide coal pillar lateral stress peak position blasting roof-cutting pressure relief method which comprises the following steps: step 1, according to a working face drilling histogram, calculating and determining a low-position key rock layer position by adopting a formula; 2, calculating the width of a working face coal pillar goaf side plastic zone by adopting a formula; 3, blasting drilling parameters are determined according to the position of the low-position key rock layer and the width of a plastic zone on the coal pillar goaf side; and 4, after blasting drilling parameters are determined, blasting drilling is conducted, in the working face advanced mining influence range, blasting top cutting is conducted on a working face air side roadway low-position key rock stratum cantilever structure, and continuous forward implementation is conducted along with working face stoping till working face stoping is completed. According to the method, the length of the lateral cantilever of the low-position key rock stratum of the goaf is reduced, the influence of the cantilever structure on stress concentration of the coal pillar is weakened, the internal stress of the coal pillar is reduced, and the stability of the goaf side roadway of the working face in the working face stoping period is ensured.
Owner:ORDOS HUAXING ENERGY CO LTD +1

An emergency power box with open-break power distribution terminals

PendingCN122533229AAvoid secondary disastersshorten recovery time
The application discloses an emergency power supply box with open-break power distribution terminals, and belongs to the technical field of emergency power supply boxes. The power supply box comprises four interval-parallel arranged power connection copper bar assemblies, which are divided into two groups and are respectively used for connecting zero lines and live lines of power supply cables and emergency cables; one grounding copper bar assembly is used for grounding connection with the power supply cables, the emergency cables and the power distribution terminals; a plurality of power distribution terminals are in sliding connection with the power connection copper bar assemblies, and are controlled by a control assembly to be respectively electrically connected with the power connection copper bar assemblies connected with the power supply cables or the emergency cables and simultaneously electrically connected with user cables; a box body is used for containing the above components, and a cable outlet is arranged at the bottom of the box body; and an emergency power supply interface is arranged outside the box body and is electrically connected with the emergency cables. The application replaces manual operation with mechanical automatic switching, and replaces scattered parts assembly with modular integration, so that the emergency power supply is fast, safe and standardized, and is especially suitable for power emergency protection of high-rise residential areas under extreme weather such as floods and typhoons.
Owner:SHANDONG LUNENG PROPERTY CO

Field cable snow removal device

ActiveCN224418397UReduce snow accumulationSimple and practical structural designSnow removalSnowpack
A kind of field cable self snow removal device mainly includes: base body, short connecting rod, long connecting rod, weight and snow accumulation component;Wherein: base body is used to be installed on cable, and keep relative fixed with cable;Base body extends short connecting rod and long connecting rod to both sides of cable on the side wall around cable, long connecting rod connects snow accumulation component, the upper surface of snow accumulation component is plane, for receiving snowfall;Short connecting rod connects weight, for balancing long connecting rod and snow accumulation component, after installation, the upper surface of long connecting rod and the snow accumulation component connected therewith are all horizontal relative to cable, short connecting rod and the weight connected therewith, and long connecting rod and the snow accumulation component connected therewith are mutually balanced.The device increases the utilization of external wind force and gravity of snow itself of cable under snow weather by the setting of snow accumulation component, can effectively reduce the accumulation of its own snow, reduce secondary disaster.
Owner:杨成林

Firewall structure

The utility model relates to the technical field of firewalls, in particular to a firewall structure which comprises a floor slab, an air pipe and a suspended ceiling, the air pipe and the suspended ceiling are arranged on the floor slab, and the air pipe is arranged between the floor slab and the suspended ceiling. A fireproof valve is arranged on the air pipe, a fire insulation layer is arranged on the side, away from the air pipe, of the floor slab, the outer surface of the air pipe is coated with a fireproof layer, a flexible heat insulation damping body of a spiral structure is arranged between the fireproof layer and the air pipe, and a supporting structure is arranged between the air pipe and the floor slab. The fireproof performance and the structural stability are improved through multiple designs. The fireproof valve, the fire insulation layer and the fireproof layer form a plurality of fireproof barriers, so that fire spreading is effectively blocked; the flexible heat insulation and shock absorption body of the spiral structure has heat insulation and shock absorption functions; the supporting structure enhances the stability of the air pipe and prevents the air pipe from falling off. All the components are in synergistic effect, the fireproof safety and practicability of the firewall structure are remarkably improved, and the fire risk and the equipment loss are reduced.
Owner:HUACHUAN CONSTR GRP CO LTD

Method and device for constructing surrounding rock strength model based on tunnel rescue drilling monitoring

ActiveCN118734415BMonitor drilling torqueMonitor drilling speedGeometric CADDesign optimisation/simulationClassical mechanicsSound wave
The present invention provides a method and device for constructing a surrounding rock strength model based on tunnel rescue drilling monitoring, which relates to the technical field of tunnel rescue, including: monitoring the real-time drilling torque, real-time drilling speed, real-time drilling power and real-time drilling speed of a drilling system, using a sound wave transmitting unit and a sound wave receiving unit to obtain the sound wave propagation speed and the sound wave intensity ratio, obtaining a damage factor according to the sound wave propagation speed and the sound wave intensity ratio, obtaining a target drilling speed and a target drilling rig speed according to the damage factor and the damage threshold, calculating real-time rotation energy according to the real-time drilling torque and the target drilling speed, calculating real-time drilling energy according to the real-time drilling power and the target drilling speed, and constructing a surrounding rock strength model according to the real-time rotation energy, the real-time drilling energy and the unit reference energy. The present invention can improve the accuracy and efficiency of the construction of the surrounding rock strength model.
Owner:CHINA RAILWAY ERJU 1ST ENG CO +1

Explosion-proof electric appliance cabinet capable of releasing pressure

The invention relates to the technical field of explosion-proof electric appliance cabinets, in particular to a pressure-relief explosion-proof electric appliance cabinet which comprises a cabinet body, a pressure relief valve, a positive pressure system and an isolation assembly. The cabinet body comprises an outer shell and an inner shell; the isolation assembly comprises four groups of isolation plates, a pressure relief cavity formed between the isolation plates and the inner shell, and a pressure relief plate connected with the isolation plates; a pressure valve is arranged at the corner angle of the inner shell; a positive pressure cavity is formed between the outer shell and the inner shell, and a mounting cavity is formed in the inner shell; and when high pressure is generated in the mounting cavity, the isolation plate is opened to introduce high-pressure gas into the pressure relief cavity for pressure relief. According to the invention, by arranging the isolation assembly to isolate the electrical components in the inner shell and arranging the pressure relief cavity, secondary disasters caused by internal high-temperature and high-pressure gas leakage can be prevented through the pressure relief cavity when the internal electrical components break down and burn.
Owner:颜威乐

PTC heater

The utility model provides a PTC (Positive Temperature Coefficient) heater. A liquid inlet pipe and a liquid outlet pipe are arranged on a shell; the plate body divides the interior of the shell into a first storage chamber and a second storage chamber, the liquid inlet pipe and the liquid outlet pipe communicate with the interior and the exterior of the first storage chamber, and a plurality of mounting grooves penetrating through the plate body are formed in the plate body; the multiple heating pieces are installed in the multiple installation grooves in a one-to-one correspondence mode and seal the installation grooves. The positive pole junction station is mounted in the second storage chamber and is provided with a plurality of positive pole pins, and the positive pole pins are electrically connected with the positive pole connecting pieces in a one-to-one correspondence manner; the cathode junction station is provided with a plurality of cathode pins, and the cathode pins are electrically connected with the cathode connecting pieces in a one-to-one correspondence manner; an anode external connection wire is led into the second accommodating chamber and is electrically connected with the anode junction station; the fuse is installed in the second storage chamber. The cathode external connection wire is introduced into the second accommodating chamber; and the fuse is connected in series between the cathode external connection wire and the cathode junction station. And when the fuse works at high temperature, the whole circuit can be disconnected, so that the high-voltage switch cabinet has higher safety.
Owner:NINGGUO HAOCHENG AUTO ELECTRIC CO LTD

Electronic passive over-current tripping relay

ActiveCN118969545AEliminate startup delaysEnsure instant responseHigh-tension/heavy-dress switchesElectromagnetic relay detailsPower gridShort circuit protection
The invention provides an electronic passive overcurrent tripping relay, relates to the field of high-voltage power grid relay protection, and solves the problem of short-circuit protection failure caused by various reasons in the prior art. An overcurrent tripping control circuit is arranged in the tripping relay, and is in isolated connection with the overcurrent tripping main loop through a control relay and a sampling electricity-taking transformer; in the overcurrent tripping main loop, a current transformer, a normally closed node of a control relay and a primary side coil of a sampling electricity taking transformer are connected in series to form a loop structure, and a current tripping electromagnet is connected in parallel with the normally closed node of the control relay; the current transformer generates a corresponding short-circuit current when an external power grid is short-circuited, and the sampling electricity-taking transformer feeds back the generation of the short-circuit current; the overcurrent tripping control circuit controls a relay to enable a current tripping electromagnet to act or reset, so that the corresponding high-voltage switch finishes tripping when an external power grid is short-circuited; the self energy of the short-circuit current is utilized to drive the protection tripping, so that the protection reliability is greatly improved.
Owner:CHENGDU BOXIN ELECTRIC CO LTD

Nuclear power circulating water pump multi-agent operation and maintenance system based on industrial physics AI engine

PendingCN121952886AEnsure seamless integrationPromote intelligent transformationPump controlAlarmsNuclear powerData acquisition
The invention discloses a nuclear power circulating water pump multi-agent operation and maintenance system based on an industrial physics AI engine, and relates to the technical field of intelligent operation and maintenance of nuclear power station equipment, the nuclear power circulating water pump multi-agent operation and maintenance system comprises a data acquisition agent, the industrial physics AI engine, a coordination agent, an operation and maintenance knowledge base and an operation and maintenance assistant agent, according to the method, a data driving model and a physical mechanism model are fused, the method is specially designed for the nuclear power circulating water pump, predictive maintenance and intelligent decision making of the nuclear power circulating water pump are achieved through the fusion data driving and physical mechanism model of a multi-agent collaboration framework and an industrial physical AI engine, and integration of a dynamic knowledge base and natural language interaction; compared with a traditional method, the operation efficiency and safety are remarkably improved, an industrial physics AI engine serves as a core, seamless fusion of a data model and a mechanism model is ensured, the fault prediction accuracy, scientificity and interpretability are improved, and secondary disasters caused by sudden faults are avoided.
Owner:HANGZHOU MOSI INTELLIGENT TECHNOLOGY CO LTD

Anti-explosion / explosion-suppression dual-protection flameless relief device for pressure-bearing equipment of petrochemical enterprise

The utility model provides an explosion-resistant / explosion-suppression dual-protection flameless relief device for pressure-bearing equipment of petrochemical enterprises, which relates to the technical field of safe overpressure relief, fire resistance and explosion suppression and comprises a pressure-bearing mechanism, an explosion venting mechanism, an intelligent fire extinguishing mechanism and a relief pipeline. The pressure bearing mechanism is connected with the explosion venting mechanism through a discharge pipeline; the explosion relief protection effect can be achieved through an adjustable compression spring and a spring gland valve seat in an explosion venting valve body in the explosion venting mechanism. And the spring pressure adjusting rod and the pressure sensor can adjust and monitor the pressing force of the spring, so that the explosion relief pressure can be adjusted and controlled. According to the device, high-temperature gas, flames and pressure waves in the pressure-bearing mechanism are discharged into the explosion venting mechanism through the release pipeline and the release valve body, so that the explosion pressure is prevented from reaching a threshold value of the pressure-bearing mechanism; the discharged high-temperature gas, flames and pressure waves are subjected to safety treatment in the explosion venting mechanism; and effective protection on the pressure-bearing equipment is realized.
Owner:SPECIAL EQUIP SAFETY SUPERVISION INSPECTION INST OF JIANGSU PROVINCE

Method for treating sludge collapse section of small-section tunnel

The invention discloses a treatment method for a sludge collapse section of a small-section tunnel, and belongs to the technical field of tunnel construction. The treatment method comprises the following steps: step 1, deslagging an excavated hole section; 2, reinforcing the tunnel by adopting an advanced small guide pipe and a pipe shed; thirdly, water plugging and cavity backfilling are conducted on the tunnel; fourthly, a temporary supporting steel arch frame is constructed on the initial support deformation section, then the steel arch frame of the initial support deformation section is dismantled truss by truss, and initial support is constructed again; 5, water drainage pipes are arranged on the arch portion, the left side wall and the right side wall of the tunnel; and sixthly, concrete is sprayed. According to the treatment method, the cavity of the sludge collapse section of the small-section tunnel can be filled, and surrounding rock mass can be reinforced; the advanced small guide pipe can play a role in grouting the cavity and reinforcing surrounding rock mass at the same time, the temporary supporting steel arch frame can be tightly attached to the arch crown of the initial support deformation section, and the safety risk in the dismantling process of the steel arch frame of the initial support deformation section is reduced.
Owner:CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP CO LTD +1