Installation method of large-diameter circular roof pipe truss

An installation method and a technology of pipe trusses, which are applied in the processing of building materials, construction, building construction, etc., can solve the problems of high performance requirements for hoisting machinery, complex auxiliary structures, and high construction costs, so as to improve assembly efficiency and ensure assembly Quality, the effect of improving installation accuracy and efficiency

Inactive Publication Date: 2018-12-21
CHINA FIRST METALLURGICAL GROUP +1
View PDF1 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] At present, in the process of hoisting pipe trusses in large venues such as large stadiums, railway stations, and terminal buildings, the traditional method of installing temporary tire frames requires a lot of auxiliary materials, requires high mechanical performance for hoisting, and the auxiliary...

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Installation method of large-diameter circular roof pipe truss
  • Installation method of large-diameter circular roof pipe truss
  • Installation method of large-diameter circular roof pipe truss

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0032] Below by embodiment, in conjunction with accompanying drawing, the technical scheme of the present invention is described further specifically, as Figure 1-4 As shown, a large-diameter circular roof pipe truss installation method includes the following steps:

[0033] Step 1. In the center of the installation site of the large-diameter circular roof pipe truss, carry out the construction and fixing of several concrete foundations 1 according to the design position of the drawing, and the concrete foundation 1 is used as the support embedded part of the temporary support of the subsequent pipe truss;

[0034] Step 2. Retest the position coordinates and elevation of several concrete foundations 1, and clearly mark them, and fill in the test records;

[0035] Step 3. Set up temporary supports on site and fix them one-to-one with the concrete foundation respectively, retest and locate the elevation and axis of the temporary supports, and mark the positions;

[0036] Step ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides an installation method of a large-diameter circular roof pipe truss. The installation method comprises the following steps that step 1, construction fixing of a plurality of concrete foundations is carried out in the center of an installation site of the large-diameter circular roof pipe truss according to the design position; step 2, repetition measurement, labeling and recording of position coordinates and elevation are carried out on the concrete foundations; step 3, temporary supports are set up on site and fixed with the concrete foundations one to one respectively;step 4-5, hoisting and welding of an inner ring truss and outer ring truss of a center circle of a circular roof are carried out; step 6, trusses 12 are symmetrically arranged in sequence, and main truss welding is carried out; step 7, installation welding of secondary trusses, supporting rods and riding tracks is carried out; step 8, the pipe truss is integrally disassembled, and it is detectedwhether or not the deflection under the pipe truss meets the requirement; step 9, the temporary supports are disassembled, and site formation is recovered. The installation method of the large-diameter circular roof pipe truss has the advantages that the rapid installation of the large-diameter circular roof pipe truss is achieved, the splicing efficiency is improved, and the splicing quality is ensured.

Description

technical field [0001] The invention belongs to the field of installation methods of large-scale pipe trusses, and in particular relates to an installation method of large-diameter circular roof pipe trusses. Background technique [0002] At present, in the hoisting process of pipe trusses in large stadiums, railway stations, terminal buildings and other large venues, the traditional method of installing temporary tire frames requires a lot of auxiliary materials, requires high mechanical performance for hoisting, and the auxiliary structure is complex and dangerous. The construction cost is high. Therefore, it is necessary to design a relatively simple and stable installation method for large-diameter circular roof pipe trusses to improve construction efficiency, reduce fabrication difficulty and construction cost, and ensure construction safety. Contents of the invention [0003] For the problems existing in the prior art, the technical scheme adopted by the present inve...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E04G21/14
CPCE04G21/14E04G21/142
Inventor 赵保华陈志新许毅
Owner CHINA FIRST METALLURGICAL GROUP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products