A transformation method for media pipelines that hinder the installation of steel columns in expanded workshops
A plant and medium technology, applied in the direction of building structure, construction, building maintenance, etc., can solve the problems of hindering the installation of steel columns, restricting the construction progress of the project, and affecting the installation of steel columns in the expanded factory building, so as to ensure the effect of effective progress
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Publication Date
- 2020-06-05
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the technical field of transformation of medium pipelines, in particular to a transformation method for medium pipelines that hinder the installation of steel columns in expanded workshops. Background technique
[0002] Metallurgical engineering often encounters the work of expanding the original plant due to the process transformation of the subsequent production line or the increase of the production scale. When most factories are expanded, the original production lines in the workshop are generally not scheduled to stop production, and the pipe network in the workshop cannot stop supplying energy media due to production, and some steel columns in the expanded factory will encounter the problem that the medium pipes outside the factory block the installation of steel columns. And it may happen that the steel columns of the expanded factory building are not lattice steel columns or the installation elevation of the medium pipe...
Examples
Embodiment 1
[0029] In the embodiment of the present invention: a method for transforming medium pipelines that hinders the installation of steel columns in expanded workshops is provided, and the construction steps are as follows:
[0030] Step 1: Find the obstruction points for the installation of steel columns for plant expansion, including:
[0031] 1. According to the longitudinal and transverse central axes of the steel columns 5 of the original factory building, and according to the design documents of the factory building expansion, extend and mark the longitudinal and transverse central axis positions of the steel columns 5 of the expanded factory building;
[0032] 2. Based on the marked intersection of the longitudinal and transverse central axes of the steel column 5 of the expanded factory building as the center, and according to the external dimensions of the steel column 5 of the expanded factory building, mark the contour line of the steel column 5 of the expanded factory bu...
Embodiment 2
[0044] Taking the expansion project of a 120t steel-making converter plant in Shandong, a medium pipeline transformation method proposed by the present invention that hinders the installation of steel columns in the expanded plant was used to complete the plant expansion work: project overview, the total elevation of the H-column steel columns of the expanded plant is 34.900m , the length of the steel column lattice structure is 18.400m, and there is one column at 300mm to the right of the center of the H column and 2 sticks medium pipeline, and the highest The central elevation of the medium pipeline is 19.200m.
[0045] The construction steps are:
[0046] Such as figure 1 As shown, Step 1: Find the obstruction point of the steel column installation of the plant extension:
[0047] 1. According to the longitudinal and transverse central axes of the steel columns 5 of the original factory building, and according to the design documents of the factory building expansion...