A plant and medium technology, applied in the direction of building structure, construction, building maintenance, etc., can solve the problems of hindering the installation of steel columns, restricting the construction progress of the project, and affecting the installation of steel columns in the expanded factory building, so as to ensure the effect of effective progress
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] In the embodiment of the present invention: a method for transforming medium pipelines that hinders the installation of steel columns in expanded workshops is provided, and the construction steps are as follows:
[0030] Step 1: Find the obstruction points for the installation of steel columns for plant expansion, including:
[0031] 1. According to the longitudinal and transverse central axes of the steel columns 5 of the original factory building, and according to the design documents of the factory building expansion, extend and mark the longitudinal and transverse central axis positions of the steel columns 5 of the expanded factory building;
[0032] 2. Based on the marked intersection of the longitudinal and transverse central axes of the steel column 5 of the expanded factory building as the center, and according to the external dimensions of the steel column 5 of the expanded factory building, mark the contour line of the steel column 5 of the expanded factory bu...
Embodiment 2
[0044] Taking the expansion project of a 120t steel-making converter plant in Shandong, a medium pipeline transformation method proposed by the present invention that hinders the installation of steel columns in the expanded plant was used to complete the plant expansion work: project overview, the total elevation of the H-column steel columns of the expanded plant is 34.900m , the length of the steel column lattice structure is 18.400m, and there is one column at 300mm to the right of the center of the H column and 2 sticks medium pipeline, and the highest The central elevation of the medium pipeline is 19.200m.
[0045] The construction steps are:
[0046] Such as figure 1 As shown, Step 1: Find the obstruction point of the steel column installation of the plant extension:
[0047] 1. According to the longitudinal and transverse central axes of the steel columns 5 of the original factory building, and according to the design documents of the factory building expansion...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com