Track space curved surface concrete flatness control method
A control method and concrete technology, applied in construction, building structure, construction material processing and other directions, can solve the problem of difficulty in controlling the smoothness of the track, and achieve the effect of effective control of the smoothness
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] Such as figure 1 As shown, this embodiment provides a method for controlling the flatness of concrete on a track space surface, including the following steps: Step S1: laying leveling pipes along the surface of the track, and fixing the leveling tubes on the steel mesh; Step S2: Spray concrete on the surface of the track, and use a scraper to level the concrete surface after the concrete spraying is completed; step S3: smooth the entire concrete surface with a trowel, and take out the leveling pipe before the initial setting of the concrete, and use Concrete of the same grade shall be sprayed and leveled.
[0020] In the method for controlling the flatness of concrete on a track space curved surface according to this embodiment, in the step S1, a leveling pipe is laid along the surface of the track, and the leveling tube is fixed on a steel mesh, and the steel mesh is used to ensure that all The strength of the track, the leveling tube is used to level the surface of t...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
