Mobility management method, network side device, and terminal

A network-side device and mobility technology, applied in connection management, electrical components, wireless communication, etc., to improve user experience, solve measurement problems, and ensure delay and reliability

Active Publication Date: 2019-01-18
DATANG MOBILE COMM EQUIP CO LTD
View PDF4 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0023] Measurement configuration and measurement reporting are usually transmitted through RRC messages, so both the MN and SN can perform measurement configuration on the UE. In the case of LTE and NR interoperability, how does the UE perform measurement reporting, and which node performs measurement reporting, no solution yet

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Mobility management method, network side device, and terminal
  • Mobility management method, network side device, and terminal
  • Mobility management method, network side device, and terminal

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0106] Embodiment 1: The master node performs measurement configuration and measurement reporting path configuration

[0107] In the scenario of interoperability between LTE and NR in this embodiment, the LTE eNB is the primary node, and the NR gNB is the secondary node. The master node performs measurement configuration and measurement reporting path configuration for the terminal. The master node sends the measurement configuration information to the terminal, and sends the reporting path configuration information of the measurement report to the terminal. The terminal receives the measurement configuration information and the reporting path configuration information, obtains the corresponding configuration information and executes the corresponding configuration.

[0108] The mobility management method of this embodiment will be described below from the main node and the terminal side respectively.

[0109] Please refer to image 3 , the mobility management method of this...

Embodiment 2

[0145] Embodiment 2: The secondary node performs measurement configuration, and the primary node performs measurement reporting path configuration

[0146] In the scenario of interoperability between LTE and NR in this embodiment, the LTE eNB is the primary node, and the NR gNB is the secondary node. The secondary node performs measurement configuration for the terminal, and the primary node performs measurement reporting path configuration for the terminal. The secondary node sends measurement configuration information to the terminal, the master node sends the reported path configuration information of the measurement report to the terminal, and the terminal receives the above measurement configuration information and reported path configuration information, obtains the corresponding configuration information and executes the corresponding configuration.

[0147] The mobility management method of this embodiment will be described below from the master node, the slave node an...

Embodiment 3

[0225] Embodiment 3: The secondary node performs measurement configuration and measurement reporting path configuration

[0226] In the scenario of interoperability between LTE and NR in this embodiment, the LTE eNB is the primary node, and the NR gNB is the secondary node. The secondary node performs measurement configuration and measurement reporting path configuration for the terminal. The secondary node sends the measurement configuration information to the terminal, and sends the reporting path configuration information of the measurement report to the terminal, and the terminal receives the measurement configuration information and the reporting path configuration information, obtains corresponding configuration information and performs corresponding configuration.

[0227] The mobility management method of this embodiment will be described below from the side of the secondary node and the terminal respectively.

[0228] Please refer to Figure 21 , the mobility manage...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a mobility management method, a network side device and a terminal. In the present invention, when a network performs measurement configuration of the terminal, the measurementreport path configuration is also configured for the terminal. According to the measurement configuration of the network, the terminal selects an appropriate path to perform the measurement uploadingof the network after the corresponding uploading condition is met, thereby solving a measurement problem in the LTE and NR interoperation scenarios. Through the reasonable path selection, the method ensures the measurement uploading through reasonable path selection, guarantees the delay and reliability of measurement uploading, optimizes network performance and enhances user experience.

Description

technical field [0001] The present invention relates to the technical field of mobile communication, in particular to a mobility management method, network side equipment and a terminal. Background technique [0002] With the development of mobile communication technology, research on 5G technology has become a hot topic today. In the early stage of 5G deployment, considering the existing deployment of the existing 4G network and the high frequency and small coverage characteristics of the 5G network itself, the joint networking of 4G and 5G is mainly used in the initial deployment. For example, LTE provides wide Domain coverage, new radio access technology (NR, New RAT) provides hotspot coverage. Therefore LTE and NR interoperability is an important technology. [0003] figure 1 It is a network scenario diagram in the case of LTE and NR interoperability, where the LTE base station (eNB) is the master node (MN, Master Node), and the NR base station (gNB) is the secondary ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): H04W24/10H04W76/19
CPCH04W24/10
Inventor 梁靖
Owner DATANG MOBILE COMM EQUIP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products