A construction method and channel technology, applied in irrigation pipelines, artificial waterways, water conservancy projects, etc., can solve problems such as difficult to control construction quality, poor structural stability, cracks or falling off, etc., to achieve easy construction quality, improve service life, and control construction progress effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0036] like Figure 1 to Figure 7 Shown, be the construction method of a kind of irrigation water delivery channel of the present invention, comprise the steps:
[0037] (a) Construction preparation: draw the opening line according to the construction drawings, and excavate the canal foundation mainly by mechanical excavation and supplemented by manual excavation. The excavation sequence from top to bottom can make drainage more convenient . Dig a temporary intercepting drainage ditch in an area with a radius of 1-5m outside the opening line to divert or pump the external water on the slope to the outside of the channel to prevent a large amount of water from flowing into the construction work surface, so as to ensure that the entire construction work surface is dry. Operation. Use sand or clay to level the foundation surface, and compact it to make it smooth. Manually repair the slope according to the designed slope. The flatness of the slope shall be controlled within ±2cm...