Grouting and post-grouting consolidation technology for prefabricated piles by full-casing construction method

A technology of prefabricated piles and full sleeves, applied in sheet pile walls, foundation structure engineering, construction, etc., can solve the problems of high cost and long construction period, and achieve the effects of shortened construction period, reduced project cost and strong practicability

Inactive Publication Date: 2019-02-01
高永光 +1
View PDF0 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The present invention "full-casing pipe construction method prefabricated pile grouting and post-grouting consolidation technology" is a new technical scheme and method after the improvement of the full-casing pipe construction method and prefabricated pile application technology method, eliminating the need to build cofferdams or use Steel casings and other construction links are directly formed into piles, which can solve the problems of long construction period and high cost of pile foundations in rivers, lakes and seawater

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0004] 1. This is a new and simple construction technology scheme and method for prefabricated pile foundation with full casing method. For construction on the sea surface of rivers, lakes, and seas, firstly, according to the engineering design requirements, the piling ship shall use the full casing method to form holes to the design elevation at the corresponding pile positions.

[0005] 2. After the hole is formed to the designed hole depth, the casing is lifted, and at the same time, cement slurry or mortar is poured into the borehole according to the design requirements to prevent the hole from collapsing in the underwater hole. Before the cement slurry or mortar is solidified, the pile driver will be used to The design requires that the prefabricated piles are driven (sinked) into the borehole to the design elevation or directly put the prefabricated piles into the bottom of the hole through the casing before the casing is lifted, pour cement or mortar, and then lift the c...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a grouting and post-grouting consolidation technology for prefabricated piles by a full-casing construction method. The grouting and post-grouting consolidation technology isapplicable to the technical fields of foundation and ocean engineering. The background technology is that at present, in the technical fields of foundation and ocean engineering, cast-in-situ bored piles in rivers, lakes and the sea have long period and high cost due to links such as cofferdam island building. The grouting and post-grouting consolidation technology can remarkably overcome the defects mentioned above. According to the main content, after holes are formed by the full-casing construction method, cement slurry or mortar is poured into the boreholes while casings are hoisted so asto prevent the underwater boreholes from collapsing; before the cement slurry or mortar is solidified, the prefabricated piles made according to the design requirements are driven (sunk) into the boreholes by using a pile driver to the design elevation or are directly put into the borehole bottoms through the casings after the holes are formed, the cement slurry or mortar is poured, and then the casings are hoisted; and meanwhile, reserved grouting pipes in the prefabricated piles are used to inject grout to the pile bottoms and pile sides, the grout can be cement slurry, mortar and chemical grout, and finally the prefabricated piles and the stratum around the boreholes are tightly cemented and fixed together.

Description

Technical field: [0001] Foundation and Ocean Engineering Technology Background technique: [0002] At present, in the field of foundation foundation and marine engineering technology, the pile foundations in rivers, lakes and seas are mostly bored piles. The most common construction schemes and methods are cofferdam building islands or steel casings. At present, these construction schemes and methods are all completed. There are the characteristics of long construction period and high project cost. How to shorten the construction period and reduce the project cost is still a problem that needs to be solved at present. Invention content: [0003] The "full casing construction method precast pile grouting and post grouting consolidation technology" of the present invention is a new technical scheme and method after the improvement of the full casing construction method and the precast pile application technology method, which saves the need for cofferdam island building or u...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E02D5/62E02D11/00
CPCE02D5/62E02D11/00E02D2250/0023E02D27/525E02D7/26E02D7/28E02D15/04E02D15/06E02D15/08E02D5/385E02D5/38
Inventor 高永光高云飞
Owner 高永光
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products