[0086] The invention provides a new method for investment ranking of power grid construction projects, such as figure 1 shown, including the following steps:
[0087] Step 1: Construct a comprehensive evaluation index system for the investment ranking of projects to be built under the new power reform environment. The comprehensive evaluation index system includes qualitative indicators and quantitative indicators; among them, the projects to be built are power grid planning projects waiting to be constructed.
[0088] Such as figure 2 As shown, the comprehensive evaluation index system adopts a three-layer index system, which are target layer, category layer and index layer.
[0089] Among them, the target layer is the first layer, which is the name of the target, specifically the comprehensive evaluation indicators for the grid planning project investme...