Hybrid energy storage system optimal configuration method for improving comprehensive performance of wind power plant
A technology of hybrid energy storage system and comprehensive performance, which is applied in the field of optimal configuration of hybrid energy storage systems to improve the comprehensive performance of wind farms, and can solve problems such as difficulty in adapting and inclusion of on-grid power assessment into configuration models, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0056] Such as figure 1 As shown, the hybrid energy storage system optimal configuration method to improve the comprehensive performance of wind farms includes the following steps:
[0057] S1, according to the adjustment rate index K 1 , Adjustment accuracy index K 2 and response time index K 3 Determine the overall service performance index K for wind farms participating in AGC pd ;Specifically:
[0058] K pd =K 1 K 2 K 3
[0059] Among them: K1 is the adjustment rate index, which is the rate at which the generator set responds to the AGC power command; K2 is the adjustment accuracy index, which refers to the deviation between the actual output and the command target power of the unit participating in the AGC service after the response command is stabilized; K3 The response time index refers to the time it takes for the unit to step out of the adjustment dead zone on the basis of the original output P0 after the energy management system issues an instruction.
[00...
Embodiment 2
[0083] Based on Example 1, a wind farm in a certain area of China is selected for modeling and simulation. The wind farm is equipped with 50 2MW wind turbines with a total installed capacity of 100MW, and a hybrid energy storage system is connected to its 35kV bus. The overall example is simulated The grid structure of the system is as image 3 shown. In order to ensure the applicability of the results, the historical output curve of any 5 days in a year of the wind farm is randomly selected as the maximum output limit of the wind turbine. Obtain the output fluctuation threshold δ according to the document w n, the AGC demand data adopts the actual data in the AGC system of the power grid on a typical day, and the sampling interval is 5s. The basic information of the hybrid energy storage system is listed in Table 1. In addition, in order to increase the economic benefits of the entire system operation, this example temporarily participates in AGC auxiliary services during...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com