Train aerodynamic performance simulation model test device and test method thereof
A test device and simulation model technology, applied in aerodynamic tests, measuring devices, railway vehicle tests, etc., can solve the problems of low maximum train speed and achieve high reliability, high test accuracy and wide application range
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] S1: Control the electromagnetic catapult to make the ejection speed 350 km / h, keep the ratio of the size of the train model to the actual size of the train at 1:10, and place the train models of Harmony, Falcon and Fuxing on the train track Sequential ejection, real-time measurement and recording of the wind speed and wind pressure inside the tunnel model under the operation of various types of train models;
[0041] S2: Control the electromagnetic catapult so that the ejection speed is 350 km / h, the ratio of the size of the train model to the actual size of the train is 1:8, and various types of Harmony, Falcon, and Fuxing are placed on the train track. The train models are ejected in sequence, and the wind speed and wind pressure inside the tunnel model are measured and recorded in real time each time the train model runs;
[0042] S3: Place the Harmony train model with a ratio of 1:10 on the train track, control the electromagnetic catapult so that the ejection speeds are...
Embodiment 2
[0045] S1: Control the electromagnetic catapult to make the ejection speed 300 km / h, keep the ratio of the size of the train model to the actual size of the train at 1:11, and place the train models of Harmony, Falcon and Fuxing on the train track Sequential ejection, real-time measurement and recording of the wind speed and wind pressure inside the tunnel model under the operation of various types of train models;
[0046] S2: Control the electromagnetic catapult so that the ejection speed is 300 km / h, the ratio of the size of the train model to the actual size of the train is 1:12, and various types of Harmony, Falcon, and Fuxing are placed on the train track. The train models are ejected in sequence, and the wind speed and wind pressure inside the tunnel model are measured and recorded in real time each time the train model runs;
[0047] S3: Place the Harmony train model with a ratio of 1:11 on the train track, control the electromagnetic catapult so that the ejection speeds ar...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com