A method for automatically counting the workload and work points of electronic operation tickets
A technology of operation tickets and workload, which is applied in the fields of office automation, calculation, and data processing applications, and can solve the problems of hard work points data, fixed operating values, statistics, and falsely high scores of the person in charge on duty.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] The present invention sets the following statistical principles; the state of the operation ticket for counting the work points must be the operation ticket of the executed and archived state; the work points obtained by all ticket-fillers, operators, and persons in charge on duty in the duty are divided by the total number of people on duty to be on duty The average number of individuals in the field, the standard of work points for all the people on duty is the same; it is only counted in twice the labor points of ticket filling and operation, and is not included in the reviewer and the person in charge of duty, whose work points are obtained from the average; each The work points obtained by all the operation tickets of the on-duty personnel in the current month are accumulated, that is, the work points of the work tickets of the current month.
[0035] Based on the above principles, a mathematical model for the statistics of the workload and work points of the electr...
Embodiment 2
[0049] The following takes an electronic operation ticket as an example;
[0050] Electronic operation ticket
[0051] Status: Executed
[0052] Ticket number: 0000001
[0053]
[0054] This action ticket has been archived. There is only one operation ticket on January 1, 2018. Query time T c It is set from 00:00 on January 1, 2018 to 24:00 on January 1, 2018.
[0055] From the signatures, it can be known that Zhang San was the person who filled out the form, Zhang San was the operator of the first three items, Wang Wu was the operator of the last three items, Liu Liu and Chen Qi were the reviewers, and Liu Liu and Cao Ba were the persons in charge. Promissory note operation spans two-value operating personnel, the former value: Zhang San, Liu Liu, and the latter value: Wang Wu, Chen Qi, Cao Ba.
[0056] Start statistics, enter the query period, there is only one operation ticket in the period, and the status is "executed" (archived). The program starts to read the t...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


