Pipe pile reinforcement method
A technology for pipe piles and reinforcement devices, applied in sheet pile walls, buildings, infrastructure projects, etc., can solve the problems of poor reliability and low construction efficiency, and achieve the effects of high reliability and improved construction efficiency.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0022] Such as figure 1 and figure 2 As shown, the present embodiment provides a pipe pile reinforcement device, which is placed on the pipe pile 10 and includes a platform main body 20, the platform main body 20 includes an integrated steel truss 21, and the steel truss 21 is provided with a plurality of The installation hole 22, and the pipe pile 10 is snapped into the installation hole 22, a plurality of support rods are arranged between the inner wall of the installation hole 22 and the pipe pile 10, and the first end of the support rod is connected with the pipe pile 10. The pipe piles 10 are against each other, the second end of the support rod is against the inner wall of the installation hole 22, and a plurality of suspension rods 23 extending upward are arranged along the inner wall of the installation hole 22, and the The first end of the suspension rod 23 is fixed on the inner wall of the installation hole 22 , and the second end of the suspension rod 23 is fixed ...
Embodiment 2
[0027] Such as figure 1 and figure 2 As shown, the present embodiment provides a pipe pile reinforcement method, using the pipe pile reinforcement device described in the first embodiment to reinforce the pipe pile, including the following steps: Step S1: lift the platform main body 20, and place the platform main body 20 The installation hole 22 on the top is aligned with the pipe pile 10; Step S2: After fixing the suspension rod 23 on the top of the pipe pile 10, a plurality of support rods are leaned against the pipe pile 10; Step S3: Adjust The position of the support rod fixes the support rod between the pipe pile 10 and the inner wall of the installation hole 22 .
[0028] In the pipe pile reinforcement method described in this embodiment, the pipe pile 10 is reinforced using the pipe pile reinforcement device described in the first embodiment. In the step S1, the platform main body 20 is lifted, and the installation on the platform main body 20 The hole 22 is aligned...