Parallel multi-tunnel structure and construction method thereof
A technology of tunnel structure and construction method, which is applied to tunnels, tunnel lining, earthwork drilling, etc., can solve the problems of low construction safety, increased extra cost, and long construction period, so as to reduce risks, reduce project costs, and improve construction. quality effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] A kind of multi-tunnel parallel tunnel structure described in the present invention, such as Figure 1-2As shown, a tunnel one and a tunnel two are included, and the tunnel two is an underground excavation tunnel, and the tunnel one is a shield tunnel, and the tunnel one includes a tunnel section one 11, and the tunnel two includes a tunnel section two 12, The clear distance between the tunnel section two 12 and the tunnel section one 11 l Less than 6m, a row of several isolation piles 2 is arranged between the tunnel section two 12 and the tunnel section one 11, and all the isolation piles 2 are arranged between the tunnel section two 12 and the adjacent tunnel section one 11. In the interval between less than or equal to 4.5m and greater than or equal to 2.2m, the diameter of each of the isolation piles 2 is 1.2-1.5m, and the buried depth of all the isolation piles 2 exceeds at least 12 of the tunnel section two. The depth of the tunnel bottom is 6m, all the isolatio...
Embodiment 2
[0036] The construction method of a kind of multi-tunnel parallel tunnel structure of the present invention adopts a kind of multi-tunnel parallel tunnel structure as in embodiment 1, and its construction method comprises the following steps:
[0037] a. Tunnel 1 and Tunnel 2 are excavated to the parallel section, and several isolation piles 2 are installed in the interval between tunnel section 12 and tunnel section 11 with a net distance of less than or equal to 4.5m and greater than or equal to 2.2m;
[0038] B, carry out sampling inspection to described isolation pile 2;
[0039] C, install displacement settlement monitoring device on the pile top of all described isolation piles 2;
[0040] d. Continue to excavate tunnel one and tunnel two, construct to the interval where the isolation pile 2 is set, first carry out the excavation of the tunnel section two 12, and wait for the tunnel section two 12 in the interval to complete the initial support , continue the excavation...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com