Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

37results about How to "Improve construction stability" patented technology

Intelligent monitoring method for large-diameter shield tunnel in karst water-rich stratum

The invention relates to the technical field of tunnel engineering monitoring, and particularly discloses a karst water-rich stratum large-diameter shield tunnel intelligent monitoring method which comprises the steps of S1, real-time geological detection, S2, shield attitude and mechanics monitoring, S3, hydrology and seepage monitoring, S4, surrounding rock deformation and stress monitoring and S5, comprehensive early warning and feedback. According to the intelligent monitoring method for the large-diameter shield tunnel in the karst water-rich stratum, accurate early warning and intelligent response of construction safety are achieved through multi-source geological detection, real-time mechanical and attitude monitoring, hydrological seepage monitoring and surrounding rock deformation stress analysis in combination with an AI algorithm, edge calculation and an optical fiber sensor; the tunnel construction efficiency and the long-term operation stability are effectively improved, and the intelligent monitoring method effectively reduces the construction safety problems of water burst, ground surface settlement, shield deviation and the like in the karst water-rich stratum by integrating various real-time monitoring technologies and algorithms.
Owner:CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION CO LTD +1

Intersection protection construction method for intersecting shield

The invention provides an intersecting shield interval protection construction method, which belongs to the technical field of building construction, and comprises the following steps: firstly, excavating an open cut foundation pit at an intersection, arranging a cast-in-situ bored pile and a crown beam as an enclosure structure in the foundation pit, and arranging a steel support system at the same time. And after the enclosure structure is completed, the foundation pit is excavated to the designed depth, and reinforced concrete supporting piles and pile top beams are constructed. And on the basis, a reinforced concrete protection plate is poured to form a sheet pile structure type protection structure system. And finally, foundation pit filling is completed in a backfilling mode. Before the shield passes through the cross point, a test section is arranged to collect related construction data, and preparation is made for subsequent formal tunneling. And in the actual shield tunneling process, the tunneling speed and the soil bin pressure are controlled, and synchronous grouting is conducted. And after crossing the cross point, arranging closed rings in the front and back areas, and carrying out wall back grouting by adopting double-liquid slurry. And finally, a geological radar is used for detecting the cavity and repairing, and the problem of mutual influence in up-down close-distance crossed tunnel construction is solved.
Owner:CHINA CONSTR EIGHTH BUREAU DEV & CONSTR CO LTD +1

Reservoir box dam filling and compacting construction method

PendingCN118958265AGuarantee quality requirementsAdjust working parametersEarth-fill damsIn situ soil foundationSoil scienceControl system
The invention provides a reservoir box dam filling and compacting construction method, which relates to the field of geotechnical engineering and comprises the following steps: S1, monitoring the water content of filling soil materials in real time, determining an excavation area according to the water content of the filling soil materials, and taking soil and transporting the soil to a box dam filling area; s2, soil materials are filled for paving; s3, after paving of the filling soil material is completed, an intelligent rolling machine is used for rolling, the compaction rate, the water content and the compaction path of the filling soil material are monitored in real time in the rolling process, and the working state of the intelligent rolling machine is adjusted in real time according to the monitoring condition; s4, geogrids are laid on the compacted filling soil materials; and S5, repeating the steps S2-S4 until filling and forming, and then carrying out subsequent work. According to the construction method, the water content and the compactness are monitored through the PLC control system, the influence of human factors on the construction quality is reduced, and the overall bearing capacity and stability of the dam are improved through the geogrids.
Owner:POWERCHINA MUNICIPAL CONSTR GRP CO LTD

Bare concrete defect detection method and system adopting machine vision

The invention provides a bare concrete defect detection method and system adopting machine vision, and relates to the technical field of image processing, and the method comprises the steps: carrying out the defect feature recognition of a collected final setting period image of a first pouring unit, and obtaining a process defect feature set; performing directional optimization of the initial construction configuration according to the process defect feature set to obtain a first construction configuration; the concrete construction equipment is operated through the first construction configuration to conduct pouring construction on the second pouring unit; and then, construction configuration updating and pouring construction are conducted on the remaining pouring units in combination with bare concrete defect detection. The technical problem that construction control precision is low due to the fact that construction control adjustment cannot be conducted according to surface defects of bare concrete in the prior art is solved. The technical effects that the construction defects are gradually reduced, the construction quality and stability of the bare concrete are effectively improved, and the construction effect and the construction control precision are remarkably improved are achieved.
Owner:CCCC FIRST HARBOR ENGINEERING CO LTD +1

Construction process for stabilizing foundation pit and slope support soil body

The invention discloses a construction process for stabilizing foundation pit and slope support soil, and particularly relates to the technical field of slope support construction, which comprises the following specific steps: S1, precise checking of a prefabricated aluminum mold, S2, soil trimming and checking, S3, installation of an adjustable screw rod, S4, detection of the installed aluminum mold, S5, bottom and edge plugging of the aluminum mold, S6, grouting: preparing mortar slurry according to a mortar matching mass ratio, and S5, grouting. S7, removing the mold; and S8, maintaining. According to the method, the standard size and the splicing mode of the aluminum mold are combined, the specific size of the aluminum mold is designed, the number of the needed aluminum mold is determined, it is ensured that the number is sufficient and not excessive, so that cost is optimized, after prefabrication of the aluminum mold is completed, traces and uneven parts left by mechanical finishing are eliminated, operation needs to be conducted strictly according to marking lines during manual finishing, and the production efficiency is improved. And it is ensured that the surface of the trimmed soil body is flat and smooth and basically located on the same plane, accurate and stable construction can be achieved according to specified requirements, and the construction quality is poor.
Owner:CHINA SHANXI SIJIAN GRP

Road and bridge construction approach slab structure

A road and bridge construction approach slab structure comprises a water tank, a fixed bottom plate, a position control sleeve shell, a gear disc, a fixed supporting leg, a movable supporting sleeve and an approach slab, the two sides of the approach slab are connected with protective plates, the approach slab is connected with the upper end of a fixed vertical rod, the middle of the fixed vertical rod is connected with a reinforcing frame, the lower end of the fixed vertical rod is connected with the fixed bottom plate, the fixed bottom plate is connected with the water tank, and the two sides of the water tank are provided with visual ports. The upper portion of the water tank is provided with a filling pipe, the filling pipe is connected with an upper cover cap through threads, the lower portion of the water tank is provided with a discharging pipe, the discharging pipe is connected with a side cover cap through threads, the upper portion of the fixing bottom plate is provided with a fastening supporting sleeve, the fastening supporting sleeve is connected with a position control sleeve shell, and the lower portion of the position control sleeve shell is provided with a butt joint inserting sleeve which is provided with a butt joint inserting groove. And the butt joint plug bushes are matched with the butt joint slots and are connected with the butt joint slots.
Owner:TRANSPORTATION BUREAU OF DACHANG HUI AUTONOMOUS COUNTY

A concrete slab sweeper

ActiveCN224468204Uimprove securityImprove construction stabilityBrushControl theory
The utility model provides a kind of concrete slab joint sweeper, including support, joint sweeping mechanism and walking wheel, support includes frame body and handrail, joint sweeping mechanism includes driving device and joint sweeping brush, joint sweeping brush is arranged in the center of frame body front end bottom, driving device is arranged on the upper portion of frame body, walking wheel is arranged in the center of frame body rear end bottom, the utility model guarantees the accuracy of joint sweeper, construction quality is better, efficiency is higher, economy is more optimal, convenient time-saving.
Owner:WUHAN MUNICIPAL CONSTR GROUP

Construction method of desert greening project

The invention relates to the technical field of desert planting, in particular to a desert greening project construction method which comprises the steps that desert soil is loosened, water-retaining agent injection and pH value adjusting operation are sequentially conducted on the desert soil, and vegetation planting is conducted after pit digging is conducted through a pit digging machine; the vegetation is fertilized, a water supply pipeline is established to irrigate the planted vegetation, and the vegetation is regularly maintained and monitored; respectively obtaining the survival number of the vegetation and the total planting number of the vegetation; determining the construction stability of the desert greening project based on the planting survival rate of the vegetation; if the construction stability does not meet the requirement, adjusting the fertilization period of the vegetation, or determining the growth resource supply effectiveness of the vegetation based on the pH value difference quantity of the desert soil at different depths; and if the growth resource supply effectiveness does not meet the requirement, adjusting the injection amount of the water-retaining agent. The construction stability of the desert greening project is improved.
Owner:NO 1 ENG CO LTD OF FHEC OF CCCC

Vertical barrier wall grouting construction equipment

PendingCN122589043AGuaranteed compactnessUniform and controllable vibration frequency
The present application belongs to the technical field of barrier wall construction, and particularly relates to a vertical barrier wall grouting construction equipment for performing grouting operation on the inside of a pile body of a barrier wall, comprising a containing pipe, an outer wall of the containing pipe being in abutment with an inner wall of the pile body, a medium driving cavity being formed in the inside of the containing pipe; a grout outlet pipe, the grout outlet pipe being coaxially sleeved in the medium driving cavity of the containing pipe, the grout outlet pipe being driven by the medium to move axially along the pile body to be ejected or retracted; a grout conveying pipe, the grout conveying pipe being coaxially arranged in the inside of the grout outlet pipe, the grout conveying pipe being in sliding fit with the grout outlet pipe, the grout conveying pipe being rotationally connected with the containing pipe; the present application conveys slurry to the grout outlet pipe through the grout conveying pipe and outputs the slurry outward, the containing pipe drives the grout outlet pipe to reciprocate axially along the pile body by means of the medium driving effect, and a linkage disturbance member generates disturbance, the integrated structure realizes synchronous cooperation of grouting and vibration functions, and can discharge air bubbles in the slurry; and the medium driving ensures that the vibration frequency is uniform and controllable, and guarantees the compactness of the pile body.
Owner:GUANGZHOU ZHONG COAL JIANGNANJICHU ENG CO

Duct piece hand hole plugging and template fixing device based on suspender embedded sleeve

The utility model relates to a segment hand hole plugging and template fixing device based on a suspender embedded sleeve. The segment hand hole plugging and formwork fixing device based on the suspender embedded sleeve comprises the embedded sleeve, a suspender and a formwork supporting mechanism. The embedded sleeve is nested at the bottom of a hand hole of a duct piece, internal threads are arranged in the embedded sleeve, the formwork supporting mechanism is mounted at an opening of the hand hole through the hanging rod, one end of the hanging rod is in threaded connection with the embedded sleeve, the other end of the hanging rod is located on the outer side of the formwork supporting mechanism and is in threaded connection with an end nut, and the hanging rod is further sleeved with a middle nut. The middle nut is located in the hand hole. Damage of a traditional drilling fixing mode to the segment structure is avoided, and the construction efficiency and stability are improved; the plugging mechanism is filled with micro-expansive concrete and is combined with a water stop ring, so that the plugging strength and the waterproof performance are effectively improved, the long-term stability of hand hole plugging is ensured, and the construction convenience, the applicability and the waterproof reliability are improved.
Owner:SINOHYDRO BUREAU 14 CO LTD

Progressive angle adjusting device with main shaft inclination angle locking function and directional drilling machine

The invention provides a progressive angle adjusting device with a spindle inclination angle locking function and a directional drilling machine, the directional drilling machine comprises a drilling machine crawler body, a rear angle adjusting assembly and a front angle adjusting assembly are respectively mounted on two longitudinal sides of the drilling machine crawler body, and a rear inclined strut assembly and a front inclined strut assembly are hinged to the top surface of the drilling machine crawler body; a feeding device is arranged above the drilling machine crawler body, and the feeding device is movably connected with the rear angle adjusting assembly, the rear inclined strut assembly, the front angle adjusting assembly and the front inclined strut assembly; the rear angle adjusting assembly, the front angle adjusting assembly, the rear inclined strut assembly and the front inclined strut assembly jointly form the progressive angle adjusting device with the main shaft inclination angle locking function. Due to the design of the progressive angle adjusting device, it can be guaranteed that the high-power automatic directional drilling machine has small hole opening height and appearance height, and meanwhile posture adjustment of a low-position hole, a large angle and a large height range can be achieved.
Owner:XIAN RES INST OF CHINA COAL TECH & ENG GRP CORP

Solid-waste-based lightweight fine-grained ceramsite as well as preparation method and application thereof

The invention is applicable to the technical field of solid waste resource utilization and novel building material preparation, and provides solid waste based lightweight fine-grained ceramsite as well as a preparation method and application thereof, and the ceramsite is prepared from titanium gypsum, iron tailing powder, a solid waste based cementing material, a chelating agent, a nanocrystalline nucleus early strength agent and mixing water according to a specific proportion. The preparation method comprises the following steps: dry mixing of raw materials, preparation of an additive solution, wet mixing, rolling granulation, normal-temperature curing, 60-95 DEG C low-temperature steam curing and drying. According to the invention, the titanium gypsum, the iron tailing powder and other low-value solid wastes are used as main raw materials, and the lightweight fine-grained ceramsite with small particle size, stable structure, low water absorption and low dry density is successfully prepared through an optimized ratio and a unique low-temperature steam curing process. The product can be used as a fine aggregate to be applied to plastering mortar, completely or partially replaces natural gravel, and the mechanical property and construction stability of the mortar are improved while the mortar capacity is reduced.
Owner:CHANGZHOU ARCHITECTUAL RES INST GRP CO LTD

A construction method using combined formwork for closing section of continuous beam side span

The present application discloses a construction method for a side span closing section of a continuous beam using a combined formwork, wherein the construction of a cantilever beam and a side span cast-in-place beam is completed separately, and the cantilever beam and the side span cast-in-place beam are connected by installing an outer guide beam, and the hanging basket of the cantilever beam and the outer formwork of the side span cast-in-place beam are both slidably connected to the outer guide beam; then the outer formwork of the side span cast-in-place beam is transversely moved to the construction position of the side span closing section, and the outer formwork is adjusted so that the outer formwork fits the concrete side wall of the end of the cantilever beam; the original support rods at the bottom of the cantilever beam and the cast-in-place beam are retained as support points for the casting construction of the side span closing section, and the bottom formwork is laid on the original support rods at the bottom of the cantilever beam and the cast-in-place beam, and the bottom formwork and the outer formwork are assembled to form a casting cavity for the side span closing section; concrete is poured in the casting cavity of the side span closing section, and the side span closing section is formed between the side span cast-in-place beam and the cantilever beam. The present application has the effect of improving the construction quality of the side span closing section.
Owner:中铁广州工程局集团桥梁建设有限公司 +2

Cofferdam device for highway bridge construction

A cofferdam device for highway bridge construction relates to the technical field of highways and comprises a plurality of cofferdam plates, the adjacent cofferdam plates are inserted together and locked through locking mechanisms, a plurality of insertion notches are formed in two sides of each cofferdam plate, the locking mechanisms are located in the insertion notches, a dovetail insertion head is arranged at one end of each cofferdam plate, a dovetail insertion groove is formed in the other end of each cofferdam plate, and the dovetail insertion grooves are located in the dovetail insertion notches. And the dovetail plugs of the cofferdam plates can be inserted into the dovetail slots of the adjacent cofferdam plates. According to the utility model, the cofferdam plate can be quickly inserted and firmly locked, and the locking mechanism adopts a mode that the clockwise and anticlockwise threaded rods are matched with the insertion plates, so that the operation is simple and convenient, and the locking effect is reliable. And through the design that the guide holes and the insertion rods are matched with the flexible springs, rapid positioning of the locking box is achieved. Due to the self-locking function of the dovetail plugs and the slots and smooth transition of the arc-shaped connecting plates, relative movement of the cofferdam plates is effectively prevented, water flow impact is reduced, and the overall bending strength is improved.
Owner:JINAN LICHENG DISTRICT URBAN & RURAL TRANSPORTATION BUREAU

A tool and method for installing anti-seepage steel for tundish nozzle

The present invention discloses a tundish water inlet anti-seepage steel installation tool, including a cover plate and a positioning rod, the cover plate is arranged above the bowl mouth of the tundish upper water inlet, the positioning rod is arranged at the center of the cover plate, the positioning rod is connected with the horizontal rotating rod through a rotating sleeve, a vertical rotating rod is arranged on the right side of the horizontal rotating rod, and the lower end of the vertical rotating rod is connected with a scraper through a rotating connector. The present invention can effectively solve the problems of skewed placement of seat bricks and uneven application of fire mud at the water inlet by closely cooperating with the scraper in two ways: horizontal and inclined, and improve the construction stability; the present invention is simple to make and has strong practicality. Compared with manual measurement, it can effectively reduce the deviation, and the fire mud can be accurately applied during construction, which enhances the reliability of construction to a certain extent, can greatly reduce the labor intensity of workers, is easy to operate, and effectively prevents molten steel from seeping into steel plates, bringing stronger guarantees for smooth ladle turning and production safety.
Owner:BEIJING LIRR HIGH-TEMPERATURE MATERIALS CO LTD

Corner constructional column formwork reinforcing device

The utility model provides a corner constructional column template reinforcing device, which belongs to the technical field of building construction, and comprises a bottom support frame, the top wall of the bottom support frame is fixedly connected with telescopic extension columns which are symmetrically distributed, and the top walls of the telescopic extension columns are fixedly connected with a top support frame. Symmetrically-distributed sliding blocks are slidably connected to the inner walls of the bottom supporting frame and the top supporting frame. According to the utility model, through the cooperation of a threaded cone, a strong spring, a pin rod, a pin hole and other parts in the arranged double-limiting assembly, the flexible adjustment and accurate positioning of the angle between the positioning plate A and the positioning plate B are realized, and the device can be tightly attached to and reinforce a template no matter a corner wall body with a right angle or other angles; the reinforcing effect of constructional column formworks at different corners is effectively guaranteed, the construction quality and stability are improved, and the problems that in the prior art, different corners are difficult to accurately adapt, consequently, the formworks are not tightly attached to the wall, and the reinforcing effect is poor are solved.
Owner:中建五局第三建设有限公司

Retaining wall construction device and construction method

The invention discloses a retaining wall construction device and method, and particularly relates to the technical field of retaining wall construction. The retaining wall construction device comprises a fixing frame, a supporting frame, an embedded electric cylinder and a bidirectional embedded reinforcing mechanism; the two-way embedded reinforcing mechanism comprises a connecting beam, two supporting beams, an inserting plate, a plurality of vertical inserting groove plates, inserting strips, a plurality of transverse groove boxes and transverse strips. The device further comprises an embedding and fixing mechanism and a reinforcing and pre-embedding mechanism. According to the two-way embedded reinforcing mechanism, after concrete slurry in a plurality of transverse groove boxes and a plurality of vertical inserting groove plates is solidified, transverse and vertical construction reinforcement can be achieved in the retaining wall, the concrete slurry can be fully embedded into the retaining wall body, and therefore in the construction process of the retaining wall, the construction efficiency is greatly improved. Therefore, the problem that the construction stability of the retaining wall is greatly reduced in the construction process of the retaining wall due to the fact that the retaining wall is difficult to be fully embedded into the retaining wall body is solved.
Owner:CHINA SHANXI SIJIAN GRP

Offshore sling type horizontal single-blade sling

ActiveCN222063918UControl the effect of improvementImprove construction stabilityLoad-engaging elementsFan bladeWinch
The utility model relates to an offshore sling type horizontal single-blade sling. Comprising an upper lifting beam, a lower lifting beam, a turning oil cylinder and a main frame structure, a folding end beam device is installed on the main frame structure, a plurality of inserting hole installation positions and an unhooking device are arranged at the two ends of the end beam device, and a hanging belt is installed between the two unhooking devices. Two groups of pulling devices are mounted on the end beam device; the pulling device comprises a pulling winch, a guide groove piece, a pulling steel wire rope and a position-adjustable pulley piece. The device further comprises a hold-down device installed on the main frame structure, the hold-down device comprises a hold-down supporting arm and a hold-down oil cylinder, a pivoting installation base is installed on the hold-down supporting arm, two sets of installation swing arms are connected to the pivoting installation base in a pivoting mode, and adjusting screw rods are installed at the two ends of each installation swing arm. And the lower end part of each adjusting screw rod is connected with a pressure head assembly through a ball head. The fan blade hoisting device can be used for stably hoisting fan blades, and is high in construction stability, convenient to operate and high in universality.
Owner:COOPER (TIANJIN) TECH CO LTD

Prefabricated Continuous Free-Form Glulam Ceiling System and its Construction Method

ActiveCN121897112BAvoid manual repeated correctionsavoid adjustmentCeilingsDovetailed workIndustrial roboticsSteel columns
This invention provides a prefabricated continuous free-form glulam ceiling system and its construction method. The system includes a main structural steel beam, steel column flanges, free-form glulam main panels, dovetail joints, and concealed F-shaped metal connectors. The glulam main panels undergo rough back processing, node processing, front rough processing, and front precision processing in the factory using industrial robots, achieving integrated high-precision manufacturing of the free-form shape and assembly nodes. Adjacent glulam components are connected by customized dovetail joints. The glulam main panels are prefabricated and connected to the main structural steel beams via concealed F-shaped metal connectors, and are not exposed after installation. The ceiling modules are assembled and glued in the factory, and then installed on-site by hoisting as a whole and bolting to the steel column flanges, thus achieving a prefabricated construction mode with a high prefabrication rate and low on-site dependence.
Owner:TONGJI UNIV

Methods for seepage prevention and reinforcement of soil around tunnels

This application provides a method for seepage prevention and reinforcement of soil around a tunnel, belonging to the field of grouting materials and soil and rock reinforcement technology. The method for seepage prevention and reinforcement of soil around a tunnel includes the following steps: (1) conducting geological exploration of the soil around the tunnel to identify and divide different levels of weak seepage areas; (2) arranging anode electrodes, auxiliary electrodes and cathode electrodes in an alternating manner along the tunnel circumference through secondary grouting holes; (3) arranging independent calcium source pipes and carbon source pipes along the tunnel axis, wherein the calcium source pipes and carbon source pipes are provided with openings; (4) releasing calcium source solution and carbon source solution into the soil around the tunnel through the calcium source pipes and carbon source pipes, while applying control voltage and current to the anode electrode, auxiliary electrode and cathode electrode to drive ions in the calcium source solution and carbon source solution to migrate directionally under the action of electric field and react in the weak seepage area to generate cement, thereby achieving soil reinforcement and seepage prevention; (5) detecting the reinforcement effect.
Owner:TIANJIN UNIV

Rock breaking pipe jacking machine and construction method thereof

ActiveCN121576092BResolve technical issues that make it difficult to proceed smoothlySolve technical problems that make it difficult to carry out pipe jacking operations smoothly
The rock breaking pipe jacking machine and the construction method thereof, which comprise a supporting base, a supporting mechanism fixedly arranged at the top end of the supporting base, a jacking mechanism slidingly arranged at the top end of the supporting mechanism, an adjusting mechanism installed on the inner wall of the jacking mechanism, and an unfolding mechanism fixedly arranged at the outer side of the adjusting mechanism. Through the mutual cooperation between the servo motor and the transmission screw rod and the moving guide block, the moving guide block can move close to or away from each other through the rotation of the transmission screw rod. The device can unfold the counterforce mechanism from the pipe jacking machine main body through the unfolding mechanism, and provide counterforce support for the hydraulic output rod without additional installation of the back wall, effectively solving the technical problem that the pipe jacking operation cannot be smoothly carried out due to the narrow space of the working well and the inability to install the back wall.
Owner:CHINA RAILWAY 11TH BUREAU GRP CORP LTD +2

Lifting stand column and automatic masonry equipment

ActiveCN222162068Ureduce loadSave time on disassembly and reassemblyBuilding material handlingStructural engineeringMechanical engineering
The utility model provides a lifting stand column. The lifting stand column comprises a mounting base, a stand column body and a driving assembly. Wherein the mounting base is used for being fixedly connected to the middle of a walking gantry rack; the stand column body vertically penetrates through the mounting seat and is in up-down sliding fit with the mounting seat, and the stand column body has a supporting state of sliding downwards to the bottom end to be supported on the bottom surface of a structure and a suspended state of sliding upwards to the bottom end higher than the top surface of the structure; the driving assembly is arranged on the walking gantry rack or the mounting base, and the output end of the driving assembly is connected with the stand column body and used for driving the stand column body to slide up and down. According to the lifting stand column provided by the utility model, the overall transfer of equipment in a non-disassembly state can be realized, and the equipment transfer time is saved, so that the equipment transfer efficiency is improved; based on the supporting state of the stand column body, the load of the walking gantry rack in the masonry construction process can be reduced, and therefore the construction stability is improved.
Owner:TANGSHAN YINGLAI TECH CO LTD

A point-bonding method for installing dry-hanging ceramic tiles and its installation method

The present invention discloses a point-bonding method for dry-hanging installation structure of ceramic panels and an installation method thereof, comprising ceramic panels, installation plates, first adjustment bolts, connecting profiles and hanging weights, wherein the installation plates are used to be fixed to the original wall surface, the installation plates are provided with installation grooves, and the two side walls of the installation grooves are relatively provided with horizontally arranged long strip jacks, the first adjustment bolts span the installation grooves and are movably mounted on the installation plates through the jacks; one side of the connecting profile is provided with an adhesive groove for accommodating an adhesive, the adhesive groove is bonded to the back of the ceramic panel through the adhesive, the other side of the connecting profile is provided with the hanging weights, the hanging weights are hung with the first adjustment bolts, and the hanging weights are provided with a second adjustment bolt extending downwards, the bottom of the second adjustment bolts abuts against the first adjustment bolts. The present invention has high installation firmness without destroying the ceramic panel structure, and has low installation costs, and the installation process is green and environmentally friendly.
Owner:GUANGDONG CENTURYSTAR DECORATION ENG CO LTD

Large-section tunnel supporting structure of deep sandy gravel covering layer and excavation method

The invention provides a large-section tunnel supporting structure of a deep sandy gravel covering layer and an excavation method, and relates to the technical field of building construction.The large-section tunnel supporting structure of the deep sandy gravel covering layer comprises a mountain advanced reinforcing module, a high-pressure spraying reinforcing body and a grouting reinforcing body, the high-spraying reinforcing bodies are vertically arranged outside the side lines of the two sides of the large-section cavern respectively, and the multiple grouting reinforcing bodies are vertically and evenly distributed in an excavation area of the large-section cavern; the indoor support module comprises a top arch opposite-penetrating anchor cable, a side wall opposite-penetrating anchor cable and an advance support body; the forepoling body is arranged on the top arch portion of the large-section cavern in the tunneling direction of the large-section cavern and used for reinforcing the top arch portion of the large-section cavern in advance before the large-section cavern is excavated. Compared with the prior art, the problems that collapse and roof collapse are likely to happen to the excavation face in the construction process can be solved.
Owner:中国水利水电第七工程局有限公司

Power cable convenient traction storage supporting device

The application relates to a power cable convenient traction storage supporting device which comprises a base, a storage structure and a traction structure. The traction structure and the storage structure are sequentially installed on the base along the cable storage direction. Two traction structures are symmetrically arranged on the base and enclose a traction channel convenient for the cable to pass through, and the cable is moved to the storage structure direction by the two traction structures. The device relies on the base to realize overall bearing and on-site layout. The cable sequentially passes through a first limiting structure, the traction structure, a second limiting structure, the storage structure and a storage guide structure along the operation direction. Through the cooperation of the structures, the automatic limiting and guiding, self-adaptive traction and regular storage of the cable are completed.
Owner:STATE GRID TIANJIN ELECTRIC POWER COMPANY +1

Portal crawler-type integral structure with guiding and auxiliary supporting functions of vibratory hammer

PendingCN119059437AEffectively assist guidance and support effectImprove construction stabilityCranesBulkheads/pilesWire rope
The invention belongs to the technical field of crawler cranes, and discloses a gantry crawler-type integral structure with vibratory hammer guiding and auxiliary supporting functions, which comprises a crane boom, a lifting hook is hoisted at the upper end of the crane boom in an extending manner, a steel wire rope sling is arranged on the lifting hook, and the bottom end of the steel wire rope sling is connected with a vibratory hammer body. The tubular pile is arranged at the bottom of the vibratory hammer body in a contact mode, and the portal structure is arranged on one transverse side edge of the vibratory hammer body and one transverse side edge of the tubular pile. By means of the crane boom, the lifting hook, the steel wire rope sling and the vibratory hammer body, a tubular pile can be driven in a vibratory hammering mode on the ground, and meanwhile the whole portal structure is arranged, and the two side guide arms and the limiting rolling wheels are arranged on the outer surface of the vibratory hammer body; effective auxiliary guiding and auxiliary supporting effects in the using process of the vibratory hammer body are achieved, and therefore the overall construction stability of the pipe pile is improved, and meanwhile the construction quality of the pipe pile is improved.
Owner:CCCC THIRD HARBOR ENGINEERING CO LTD

Method for evaluating filtration and film-forming characteristics of thixotropic slurry of jacking pipe of confined aquifer

The invention provides a confined aquifer jacking pipe thixotropic slurry filtration-loss film-forming characteristic evaluation method. The method comprises the following steps: S1, setting up a system; s2, laying a confined aquifer; s3, testing the initial permeability coefficient of the confined aquifer; s4, preparing thixotropic slurry; s5, applying the water pressure of the confined aquifer; s6, thixotropic slurry filtration and film forming test; s7, testing the permeability coefficient of the percolation reinforcement body of the confined aquifer: performing one-way permeation of water in the soil body from bottom to top, and calculating to obtain the permeability coefficient of the percolation reinforcement body of the confined aquifer; s8, thixotropic slurry filtration film-forming characteristic evaluation: drawing a relation curve of the filtration depth, the liquid level descending height, the liquid filtration volume and the filtration time in the thixotropic slurry filtration process, and establishing a fitting equation to obtain the filtration stall rate of the thixotropic slurry. According to the method, pipe jacking thixotropic slurry filtration, film forming and seepage combined testing is adopted, the thixotropic slurry filtration and film forming performance is comprehensively evaluated, the slurry formula is optimized, and the construction efficiency and the drag reduction effect are improved.
Owner:ANHUI UNIVERSITY OF ARCHITECTURE

A multi-high pressure adaptive micro-disturbance jet grouting drilling tool

The present invention discloses a multiple high-pressure adaptive micro-disturbance rotary jet drilling tool, which belongs to the technical field of rotary jet grouting. The multiple high-pressure adaptive micro-disturbance rotary jet drilling tool of the present invention includes a rotary jet diverter, a rotary jet drill rod, a vacuum suction device and a drill bit. It creatively adopts a multi-channel high-pressure rotary jet diverter, and cooperates with the rotary jet drill rod to realize high-pressure jetting at multiple levels, which increases the construction efficiency by many times and improves the pile quality; each level injection point is a high-pressure gas and high-pressure polymer dual-channel nozzle, which protects the high-pressure strength of the high-pressure polymer jet and cuts the soil more effectively. In addition, the vacuum suction device is creatively adopted, and no manual intervention is required during the entire rotary jetting process, which avoids quality problems caused by manual operation errors, and the construction operation is simpler and more convenient; at the same time, the wireless pressure sensor at the bottom can transmit the pressure in the underground hole to the mechanical equipment operating platform in real time, and can dynamically adjust the pressure in the hole; it no longer relies on imported MJS equipment, which greatly reduces the construction cost of micro-disturbance rotary jet grouting.
Owner:JIANGSU JIANYUAN CONSTR CO LTD +1

Novel double-fold eyelid suspended ceiling assembly

The utility model relates to the technical field of suspended ceilings, in particular to a novel double eyelid suspended ceiling assembly which comprises a first installation hanging plate, a second installation hanging plate is arranged at the bottom of the first installation hanging plate, and the first installation hanging plate and the second installation hanging plate are connected in a sliding mode through a plurality of connecting mechanisms. The connecting mechanism can freely adjust the distance between the first mounting hanger plate and the second mounting hanger plate, and the left end of the first mounting hanger plate is fixedly connected with a plurality of inserting mounting pipes. By moving one mounting hanger plate, driving the pressurizing nut and the sliding block to move in the sliding channel and rotating the pressurizing nut after the mounting hanger plate is in place, extrusion force on a connecting part is enhanced, the two hanger plates are reinforced, construction efficiency and stability are improved, complicated tools and cumbersome steps are not needed in the adjusting mode, the construction efficiency is greatly improved, and the construction cost is reduced. And meanwhile, the stability and reliability of the suspended ceiling assembly after installation are guaranteed, and use is very convenient.
Owner:ANHUI DEDI INTELLIGENT TECH CO LTD