Prefabricated bearing platform mounting method

The invention discloses a prefabricated bearing platform mounting method and relates to the field of bridge construction. The prefabricated bearing platform mounting method comprises the following steps that a bearing platform and bottom pier bodies are prefabricated in a prefabrication field, and steel pile hole positions are reserved in the bearing platform; the bearing platform is lifted to a pile site by a large floating crane; a pile top guiding device is pre-mounted on steel piles in the pile site before the bearing platform is lifted; after the bearing platform is lifted down and is in place, a carrying pole is arranged on a pile top longitudinal direction adjusting position in a hanging manner, and the horizontal plane of the bearing platform is regulated as required; and the pouring of bottom-sealing concrete of a steel cylinder cofferdam, the water pumping, the binding of reserved hole steel reinforcing bars, and the pouring of reserved hole concrete at non-lifting points and lifting points are sequentially finished, and the steel cylinder cofferdam is detached, so that the mounting of the prefabricated bearing platform is finished. According to the prefabricated bearing platform mounting method disclosed by the invention, a small steel cylinder cofferdam replaces a large bearing platform steel cofferdam, so that the steel material can be effectively saved, the on-water operation time is shortened, and the construction cost is reduced; and meanwhile, the influence of water flow to the construction of the bearing platform is reduced, and the construction quality of the bearing platform is ensured.
Owner:CHINA RAILWAY MAJOR BRIDGE ENG GRP CO LTD

Construction and operating method inside elevator shaft

The invention discloses a construction and operating method inside an elevator shaft. The construction and operating method comprises the following steps that A, an operating platform is obtained, theoperating platform includes a top frame, a supporting frame and tilted supporting parts, brackets are vertically disposed on the supporting frame, lifting lugs used for lifting are further disposed on the top frame, a construction platform is hinged to the upper portion of the top frame, and a height adjustment mechanism and a levelling controller are disposed between the construction platform and the top frame; B, the operating platform is lifted in the completed elevator shaft through a tower crane, and the brackets are sited on a floor of an elevator shaft door to support the whole operating platform and adjust the height adjustment mechanism, so that the operating platform is in a horizontal state, installation of the operating platform is finished, and operators conduct constructionon the operation table; C, after construction is finished, the operating table is lifted to a last floor; and D, the above steps B and C are repeated until operation and construction in the elevator shaft are completed. The construction and operation method inside the elevator shaft has the advantages that construction difficulties can be reduced, the construction environment can be improved, andimprovement of construction stability and safety is facilitated.
Owner:CHINA METALLURGICAL CONSTR ENG GRP

Puttying robot

ActiveCN110424690AEnsure flatness and firmnessImprove construction efficiency and effect stabilityBuilding constructionsAgricultural engineeringStorage tank
The invention discloses a puttying robot. The puttying robot comprises a storage tank assembly and a puttying rotary assembly; the storage tank assembly comprises a hollow storage tank body, a feedinginlet is formed in the upper part of the hollow storage tank body, a discharging outlet is formed in the lower part of the hollow storage tank body, and the tank body is internally provided with an extruding plate capable of rotating; the puttying rotary assembly comprises a coating belt capable of rotating, the coating belt is provided with a plurality of scraping plates, the discharging outletof the storage tank assembly is formed in one side of the coating belt, thus the scraping plates can scrape putty from the discharging outlet, the puttying rotary assembly is provided with a limitingpart, and the limiting part can keep the part, facing the construction wall surface, of the coating belt to be vertical; and a transition storage groove is formed in the lower part of the coating belt, thus the scraping plates can be connected into the transition storage groove in an abutting mode, the transition storage groove is provided with a groove inlet and a groove outlet, the groove inletis connected with the discharging outlet of the storage tank assembly, and the scraping plates can extend out of the groove outlet. After the puttying robot conducts construction, the wall surface canbe vertical, and the project acceptance standards are met.
Owner:GUANGDONG BOZHILIN ROBOT CO LTD

Liquid aqueous multi-color granite coating and preparation method thereof

InactiveCN104087103AThickening phenomenon after solvingHigh viscosityCoatingsEmulsionPreservative
The invention discloses a liquid aqueous multi-color granite coating and a preparation method thereof, for solving the problems that a conventional aqueous granite coating is severely thickened after a multi-color coating is stored, and is large in viscosity and has easily damaged constructed multi-color particles. The liquid aqueous multi-color granite coating is prepared from the following raw materials in parts by weight: 23.0-27.0 parts of silicone acrylic emulsion, 1.0-2.0 parts of propylene glycol, 1.0-2.0 parts of filming agent, 0.1-0.3 part of defoaming agent, 8.0-14.8 parts of water, 0.1-0.3 part of preservative, 0.1-0.3 part of thickening agent and 58.0-62.0 parts of multi-color particles. According to the coating, multi-color paint protecting glue is used together with special resins, elastic emulsion and silicone acrylic emulsion special for multi-color paint, the reaction gel degrees of different components are controlled to achieve relative balance of a system, the coating is free of color bleeding phenomenon after being stored for a long time and is clear and definite in color particle after being sprayed, the later thickening phenomenon of the stored liquid aqueous multi-color granite coating is effectively solved, and the storage and construction stability is improved.
Owner:西北永新涂料有限公司

Evaluation method for arch rib hoisting construction stability based on fuzzy comprehensive evaluation

The invention relates to an evaluation method for arch rib hoisting construction stability based on fuzzy comprehensive evaluation, belonging to the technical field of bridge construction. The method comprises the following steps: S1, determining factors affecting the arch rib hoisting construction stability; S2, dividing the evaluation grades of the arch rib hoisting construction stability according to factor theoretical values and defining critical judgment values of the evaluation grades under the factors; S3, acquiring the actual monitoring values of the factors in a construction process, determining a membership function, and calculating the membership degrees of the stability evaluation grades of the factors; S4, determining the factor weights by means of a subjective and objective combined method; and S5, performing fuzzy comprehensive evaluation on the arch rib hoisting construction stability according to the factor weights and the membership degrees. According to the method provided by the invention, the safety problem in the arch rib construction process is quantitatively evaluated, so that the construction safety and the construction monitoring effectiveness are guaranteed; by treating a fuzzy evaluation object through a precise digital means, quantitative evaluation on fuzzy data is performed.
Owner:LIAONING TECHNICAL UNIVERSITY

Shield tunnel prefabricated mid-partition mounting device

InactiveCN112761664AImprove construction qualityLow skill requirements for construction operationsUnderground chambersTunnel liningHydraulic motorArchitectural engineering
The invention discloses a shield tunnel prefabricated mid-partition mounting device. The shield tunnel prefabricated mid-partition mounting device comprises a main frame assembly, a mounting trolley assembly and a grabbing assembly, wherein one side of a mounting seat in the grabbing assembly is placed on a cylinder rod of a transverse adjusting oil cylinder; a connecting hinged support is arranged in the middle of the other side of the mounting seat; fine-adjustment hinged supports are separately arranged on the mounting seat and on two sides of the connecting hinged support; a rotary hydraulic motor mounting seat is fixedly hinged to the connecting hinged support; a rotary hydraulic motor is placed on the rotary hydraulic motor mounting seat; fine-adjustment oil cylinders are separately mounted on the fine-adjustment hinged supports on two sides of the connecting hinged support in a hinged manner; and the other ends of the fine-adjustment oil cylinders are fixedly hinged to the fine-adjustment hinged supports on two sides of the rotary hydraulic motor mounting seat. Various properties of a mechanical structure of the shield tunnel prefabricated mid-partition mounting device meet requirements of a construction site; and compared with a traditional construction mode, the shield tunnel prefabricated mid-partition mounting device has the advantages that the construction period can be greatly shortened, the construction stability is good, controllability of a construction process is high, the construction quality of a prefabricated mid-partition is improved effectively, and requirements on construction operation skills of workers are low.
Owner:CHINA RAILWAY TUNNEL GROUP CO LTD +1

Preparation method of environmental-friendly rubber asphalt

The invention relates to an asphalt preparation method, and discloses a preparation method of an environmental-friendly rubber asphalt. The environmental-friendly rubber asphalt comprises 70 to 100 parts of No.90 petroleum asphalt, 20 to 40 parts of a rubber powder, and 0.2 to 5 parts of a deodorant. The preparation method comprises following steps: at a certain temperature, petroleum asphalt is heated for melting, a hydrogen sulfide removing agent is added, high speed shearing (shearing speed is controlled to be 2000 to 4500r/min) is adopted, stirring is carried out for 0.5h, the rubber powder is added, high speed shearing is carried out at a rotating speed of 5000r/min for 40min, volatilized gas including alkanes, mercaptan, and alkenes is subjected to concentration recycling, reinjection is carried out in cooling process, so that the environmental-friendly rubber asphalt is prepared. Adding of the hydrogen sulfide removing agent is capable of removing hydrogen sulfide gas volatilized from asphalt, concentration treatment is capable of recycling asphalt effective components with boiling points ranging from room temperature to processing temperature. The preparation method is capable of reducing volatilization of harmful substances, improving pavement performance, improving production process, and providing a feasible approach for ecological environment protection.
Owner:梁兵

Secant pile guide wall formwork and formwork supporting structure construction method

The invention discloses a secant pile guide wall formwork. In the construction process, for installation and construction of the guide wall formwork, a first locking assembly, an inner threaded sleeve and a second locking assembly are used cooperatively, so that the construction stability of the secant pile guide wall formwork can be improved, the construction quality of the secant pile guide wall formwork is improved, the formwork can be correspondingly regulated and controlled according to actual construction requirements, the construction flexibility of the formwork is improved, the actual construction requirements can be preferably met, and the overall construction economic benefits are improved. According to a formwork supporting structure construction method of the secant pile guide wall formwork, the standard formwork of the secant pile guide wall aluminum formwork adopts dense rib design, has the advantages of high rigidity, no deformation or bulge, convenience and rapidity in operation, low labor intensity and high efficiency and can be quickly disassembled, the shaping design is adopted for safe, efficient and easy operation of use of on-site disassembly and assembly transportation tools, factory production and manufacturing are achieved, and the formwork project quality is high.
Owner:CHINA CONSTR EIGHTH ENG DIV

Self-anchorage cable bent tower driving cross brace arranging method

The invention discloses a self-anchorage cable bent tower driving cross brace arranging method. The method comprises the following steps of 1 machining a cross brace body, 2 machining a steel casing pipe, 3 lifting a cross brace body and the steel casing pipe, 4 installing a jack and 5 performing welding and fixing. The overall anti-bending capacity of the cable bent tower can be improved, a transverse brace steel tube bearing beam and a steel casing pipe bearing beam are arranged inside the cross brace steel pipe and the steel casing pipe in advance respectively, then, in the installing process, the jack can synchronously act on the cross brace steel pipe and the steel casing pipe according to the designed jacking force, and then the movable connection portion of the cross brace steel pipe and the steel casing pipe is welded and fixed after the cross brace steel pipe and the steel casing pipe are in place; according to the method, under the concrete dead-weight construction load and wind load effect, the pylon root pulling stress can be greatly lowered, and therefore the pylon generate no crack; it is ensured that construction is performed in order while the construction quality is ensured; meanwhile, construction of the cross brace is convenient, and the construction safety and stability can be improved.
Owner:ROAD & BRIDGE INT +1

Steel casing type deep sea vibroflotation pile construction method

The invention discloses a steel casing type deep sea vibroflotation pile construction method. The steel casing type deep sea vibroflotation pile construction method comprises the steps that (1) a steel casing is driven to a set depth below a sea bottom surface at a set pile position by a floating crane installed on a crane vessel; (2) seawater inside the steel casing is pumped, and soil inside thesteel casing is removed; (3) a vibrator is placed into the steel casing through the floating crane and descends to the specified depth, sand is backfilled into the steel casing, and then the vibratoris started to vibrate the sand; (4) the floating crane is used for simultaneously lifting the steel casing and the vibrator, and the sand is continuously backfilled into the steel casing and vibratedsection by section; and (5) when the steel casing and the vibrator leave the sea bottom surface, backfilling of the sand is stopped, and the vibrator is closed to complete the pile making process. Byusing the steel casing type deep sea vibroflotation pile construction method, a water-free environment can be created in a deep water area for construction to prevent filler such as the backfilled sand from being washed away by the water flow, the construction difficulty of reinforcing a foundation in the deep water area is greatly reduced, and the construction stability is increased.
Owner:TIANJIN UNIV

Installation method of prefabricated platform

The invention discloses a prefabricated bearing platform mounting method and relates to the field of bridge construction. The prefabricated bearing platform mounting method comprises the following steps that a bearing platform and bottom pier bodies are prefabricated in a prefabrication field, and steel pile hole positions are reserved in the bearing platform; the bearing platform is lifted to a pile site by a large floating crane; a pile top guiding device is pre-mounted on steel piles in the pile site before the bearing platform is lifted; after the bearing platform is lifted down and is in place, a carrying pole is arranged on a pile top longitudinal direction adjusting position in a hanging manner, and the horizontal plane of the bearing platform is regulated as required; and the pouring of bottom-sealing concrete of a steel cylinder cofferdam, the water pumping, the binding of reserved hole steel reinforcing bars, and the pouring of reserved hole concrete at non-lifting points and lifting points are sequentially finished, and the steel cylinder cofferdam is detached, so that the mounting of the prefabricated bearing platform is finished. According to the prefabricated bearing platform mounting method disclosed by the invention, a small steel cylinder cofferdam replaces a large bearing platform steel cofferdam, so that the steel material can be effectively saved, the on-water operation time is shortened, and the construction cost is reduced; and meanwhile, the influence of water flow to the construction of the bearing platform is reduced, and the construction quality of the bearing platform is ensured.
Owner:CHINA RAILWAY MAJOR BRIDGE ENG GRP CO LTD

High-safety-coefficient maintenance platform for hydropower station generator set

The high-safety-coefficient maintenance platform for the hydropower station generator set comprises a lower platform body, a support and an upper platform body which are sequentially arranged from bottom to top, a hollow channel is formed in the support, a lift car moving up and down along the support is arranged in the channel, and a movable moving platform is arranged on the outer portion of the support in a surrounding mode; the movable platform is fixedly connected with the lift car and moves up and down along the support, a vertical opening is formed in one side of the support, and the side, corresponding to the opening, of the lift car communicates with the surface of the movable platform. The aerial platform is provided with the three loading platforms, so that the aerial platform which is large in area and stable is provided, the aerial platform can cover all directions in the vertical direction of the internal space of the generator set, workers can stand on the three different platforms to carry out various work such as installation, disassembly and maintenance, and the aerial platform has higher construction stability and safety coefficient; and large working equipment can be borne, and high-efficiency maintenance and repair are facilitated.
Owner:宜昌远科自动化有限公司

A manned lifting device for building wall inspection and repair

The invention provides a manned lifting device for building wall surface detection and repair. The manned lifting device comprises a supporting steel frame and a bearing steel frame, wherein the bearing steel frame is positioned above the supporting steel frame, and at least one lifting assembly is arranged between the bearing steel frame and the supporting steel frame; a lifting supporting blockused for supporting the lifting assemblies is arranged at the top of the supporting steel frame, and bases are arranged at the positions, corresponding to each lifting assembly, of the bottom of the bearing steel frame; each lifting assembly is composed of a linear driving mechanism and a lifting supporting part; and each lifting supporting part is formed by seamless butt joint of a plurality of lifting supporting plates, a guide channel used for allowing the lifting supporting plates to pass through is formed in each lifting supporting block in a penetrating mode, and a locking mechanism is arranged on one side of each lifting supporting block. According to the manned lifting device, the structure is simple, construction and mounting operation is facilitated, the lifting structure adoptsmodular design, the problems of shaking and inconvenient mounting of traditional lifting are avoided, meanwhile, secondary damage to the wall surface is avoided, and the construction stability is high.
Owner:JIUJIANG VOCATIONAL & TECHN COLLEGE

Concrete pump truck and vibration damping method for boom end of concrete pump truck

The invention discloses concrete pumping equipment and an arm rest tail end vibration reduction method for a concrete pump truck. The concrete pumping equipment comprises a concrete conveying pipe and a gas charging system. The gas charging system comprises a pressure gas source (1) and a gas charging pipeline (2), the gas charging pipeline is connected with the pressure gas source and the concrete conveying pipe so as to charge pressure gas into a pipe cavity of the concrete conveying pipe. The pressure gas is creatively charged into the concrete conveying pipe through the gas charging system which is additionally arranged, so that the continuous gas is charged into the discontinuous size of concrete which is pumped discontinuously, and pumped media flow continuously; thus, pumping impact is reduced radically, and the purpose of reducing the tail end vibration of an arm rest is achieved; in addition, the pressure gas is charged, so that multiphase flows are formed inside the concrete conveying pipe, internal energy consumption among the multiphase flows is increased, and vibration is also relieved radically. Therefore, in the construction process of the concrete pump truck, the arm rest tail end displacement vibration can be reduced initiatively, and the construction stability of the concrete pump truck is improved.
Owner:ZOOMLION HEAVY IND CO LTD

A construction method for an elevator shaft operating platform

The invention discloses a construction method of an elevator shaft operation platform. The construction method comprises the following steps that A, the operation platform is acquired, the operation platform comprises a top frame, a support frame and a diagonal bracing member, the support frame is provided with a bracket vertically arranged, and the top frame is further provided with a lifting lugfor lifting; a construction platform is hinged to the upper part of the top frame, and a height adjusting mechanism is arranged between the construction platform and the top frame; B, the operating platform is lifted to a completed elevator shaft through a tower crane, the bracket is located on a floor slab at an elevator shaft door to support the entire operation platform, the height adjusting mechanism is adjusted to enable the construction platform to be in a horizontal state, the installation of the operation platform is completed, and construction personnel carries out construction on the construction platform; C, after the construction is completed, the operating platform is lifted to an upper floor; and D, the steps B and C are repeated until the operation construction in the elevator shaft is completed. The construction method has the advantages of being able to reduce construction difficulty, improving the construction environment, improving construction stability and safetyand the like.
Owner:中冶建工集团(天津)建设工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products