Split piece prefabrication process for connecting rod pieces with bolts
A technology of connecting rods and bolts, which is applied in the prefabrication process of shards and prefabrication of shards in modules, which can solve the problems of waste of resources, failure to install and prefabricate bolted rods normally, and easy repair of bolted rods, etc., to avoid Waste of resources, solve the problem of prefabrication installation accuracy, and improve the effect of prefabrication efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0046] Such as Figure 1-Figure 13 Shown, the present invention adopts following steps:
[0047] The first step: if figure 1 As shown, after the main beam 1 is cut according to the actual size, the first main beam stiffener plate 12 is installed on the flange where bolt holes need to be opened on the inner side of the shaped steel by welding; then, the second bolt hole needs to be opened outside the shaped steel The second main beam stiffener plate 13 is placed in the installation position; then the first main beam stiffener plate 12 and the second main beam stiffener plate 13 are drilled together with the main beam 1 flange, and the second main beam stiffener plate 13 Use four temporary ordinary bolts to install and fix on the main beam 1 flange, and apply 100% torque;
[0048] The second step: if figure 2 As shown, several main beam stiffeners 11 arranged on the main beam 1 are prefabricated into a small whole; since the main beam stiffeners 11 are spliced by several s...