Control method of amount of precipitation of deep foundation pit in binary structure stratum
A binary structure and control method technology, which is applied in infrastructure engineering, construction, etc., can solve the conflict between the depth of drawdown and the loss of water resources, and achieve the effect of small ground settlement and small water pumping
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] The specific implementation manners of the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0028] see figure 1 Shown, the control method of the deep foundation pit precipitation of binary structure formation of the present invention is characterized in that, comprises the following steps:
[0029] Step S1, constructing a vertical curtain in the foundation pit, so that the depth of the vertical curtain inserted into the confined aquifer is greater than 2 / 3 of the thickness of the aquifer;
[0030] Step S2, installing a water filter pipe so that the water filter part of the water filter pipe is on the upper part of the impermeable layer, and the diameter of the water filter pipe is equal to 250mm, and the length of the water filter pipe is 10m-12m;
[0031] Step...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com