Railway signal centralized monitoring system testing platform
A centralized monitoring and system testing technology, which is applied in the field of railway signal technology and railway signal centralized monitoring system, can solve the problems that cannot meet the needs of CRCC certification testing, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0063] Embodiment 1: as figure 1 , Figure 2(a), Figure 2(b), image 3 , Figure 4 , Figure 5 , Image 6 , Figure 7 , Figure 8 and Figure 9 As shown in the figure, a test platform for centralized railway signal monitoring system includes standard electric section monitoring center, station ring network, station signal source simulation subsystem, interface simulation subsystem, standard station, and expert auxiliary support module.
[0064] A test platform for a railway signal centralized monitoring system is divided into two parts: a central environment and a station environment.
[0065] The monitoring center of the standard electric service section, the station ring network, the interface simulation subsystem, and the expert auxiliary support module are integrated and built together to form a central environment, as shown in Figure 2(a) and Figure 2(b).
[0066] like figure 1 As shown, the station signal source simulation subsystem is integrated with the standard...
Embodiment 2
[0075] Embodiment 2: as image 3 Shown, a kind of railway signal centralized monitoring system test platform testing method, comprises steps as follows:
[0076] Step 1, preparation stage: the manufacturer deploys the software and hardware to be tested, and conducts network debugging;
[0077] Step 2, the first step of the formal test: test whether the hardware of the station machine to be tested meets the safety requirements of monitoring;
[0078] Step 3, formal test Step 2: Test the hardware acquisition performance and station software functions of the station machine to be tested (including real-time display, curve, report, playback, alarm, setting and other functional items);
[0079] Step 4, Formal test Step 3: Test the ability of the telecommunications section center of the manufacturer to be tested to connect to the standard station according to the interconnection agreement;
[0080] Step 5, Formal test Step 4: Replace with the standard telecommunications section ce...
Embodiment 3
[0115] Embodiment 3: A test platform for a centralized railway signal monitoring system, including a standard electric section monitoring center, a station ring network, a station signal source simulation subsystem, an interface simulation subsystem, a standard station, and an expert auxiliary support module.
[0116] Among them, the monitoring center of the electricity section and the ring network of the station jointly build the wide area network (monitoring network) and central system architecture in the signal centralized monitoring system.
[0117] Other station subsystems such as standard stations can be connected to the monitoring network to realize interconnection and interoperability testing.
[0118] The station signal source simulation subsystem and the interface simulation subsystem jointly simulate the electrical characteristics, logic status and other information of the station turnout, signal machine, interlocking, train control and other systems (or equipment), ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com