A power grid project cost assessment method
A technology of engineering cost and power grid, applied in instruments, data processing applications, information technology support systems, etc., can solve problems such as interference from non-key influencing factors, omission of key influencing factors, difficulty in ensuring accuracy, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0050] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0051] The invention discloses a method for evaluating the cost of a grid project, which includes the following four steps,
[0052] Step 1. Sort out and normalize the data of influencing factors in the power grid project cost corresponding to the new technology situation primitive, and construct a sample database, which specifically includes the following steps,
[0053] 1.1 Collect the cost data of 35kV-500kV power grid projects that have been completed and put into operation in the past five years under the new technology situation, and sort out the data of influencing factors that constitute the cost of power grid projects from two aspects of substation engineering and line engineering to establish an original database; the influencing factors include substation engineering Influencing factors and influencing factors of line engineering. Influencing...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com