Modified asphalt pretreatment new process
A modified asphalt and pretreatment technology, which is applied to building components, building insulation materials, buildings, etc., can solve the problems of low product output rate, low production efficiency, and high labor intensity, and improve product quality and production efficiency. , the effect of reducing workload
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0053] The new process for pretreatment of modified asphalt disclosed in this embodiment comprises the following steps:
[0054] S1: Pump the mixture into modified tank 1 and modified tank 2 respectively, raise the temperature to 140°C, and dehydrate for 0.5h;
[0055] S2: Add composite modifier a to modification tank 1, raise the temperature to 175°C, modify for 1.0h, and obtain masterbatch A; add composite modifier b to modification tank 2, raise the temperature to 175°C, and stir for 0.5 h;
[0056] S3: Add 9% reclaimed rubber powder into modified tank 2, stir for 2.5 hours, keep the temperature at 180°C, and obtain masterbatch B;
[0057] S4: respectively pump 20% of masterbatch A and 50% of masterbatch B into modification tank 3, stir evenly, and obtain mixed glue;
[0058] S5: Add 30% stone powder into the modified tank 3, lower the temperature to 160° C., and obtain the product.
Embodiment 2
[0060] The modified asphalt pretreatment process disclosed in this embodiment comprises the following steps:
[0061] S1: Pump the mixture into modified tank 1 and modified tank 2 respectively, raise the temperature to 135°C, and dehydrate for 0.6h;
[0062] S2: Add composite modifier a to modification tank 1, raise the temperature to 170°C, modify for 1.1h, and obtain masterbatch A; add composite modifier b to modification tank 2, raise the temperature to 170°C, and stir for 0.6 h;
[0063] S3: Add 7% reclaimed rubber powder into modified tank 2, stir for 3 hours, keep the temperature within the range of 175°C, and obtain masterbatch B;
[0064] S4: respectively pump 40% of masterbatch A and 30% of masterbatch B into modified tank 3, stir evenly, and obtain mixed glue;
[0065] S5: Add 30% stone powder into the modified tank 3, cool down to 155° C., and obtain the product.
Embodiment 3
[0067] The new process for pretreatment of modified asphalt disclosed in this embodiment comprises the following steps:
[0068] S1: Pump the mixture into modified tank 1 and modified tank 2 respectively, raise the temperature to 140°C, and dehydrate for 0.5h;
[0069] S2: Add composite modifier a to modification tank 1, raise the temperature to 180°C, modify for 1.1h, and obtain masterbatch A; add composite modifier b to modification tank 2, raise the temperature to 180°C, and stir for 0.6 h;
[0070] S3: Add 11% reclaimed rubber powder into modified tank 2, stir for 3.0 hours, keep the temperature within the range of 185°C, and obtain masterbatch B;
[0071] S4: pump 45% of masterbatch A and 25% of masterbatch B into modified tank 3, stir evenly, and obtain mixed glue;
[0072] S5: Add 30% stone powder into the modified tank 3, lower the temperature to 160° C., and obtain the product.
[0073] It should be noted that the equipment involved in this application all adopts t...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


