Installing method of underground diaphragm wall stirring pile
An underground diaphragm wall and installation method technology, applied to sheet pile walls, buildings, foundation structure engineering, etc., can solve problems such as uneven settlement, achieve the effects of reduced consumption, simple structure and construction, and reduced project cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] see figure 1 , the present invention provides a technical solution: a method for installing an underground diaphragm wall mixing pile, comprising the following steps:
[0030] S1: Level the site, remove weeds and sundries on the surface, use backfill cohesive soil and compact it in low-lying areas to meet the bearing capacity of the foundation when the pile driver is running, and for paddy fields, clean the surface 0.3-0.5m after draining , Make the original ground into a 4% transverse slope, and excavate side ditches on both sides of the subgrade, and take protective measures such as marking for the pipelines under the construction site;
[0031] S2: Measurement and stakeout, after using the total station to accurately release the control piles according to the drawings, release the specific pile positions according to the pile location layout, set obvious signs for the control piles, and review them regularly;
[0032] S3: Mix cement slurry. The cement slurry is prep...