Construction method of outer hoop integraltie-type cylindrical frame beam
A construction method and frame beam technology, applied in the field preparation of formwork/formwork/work frame, building components, construction, etc., can solve the problems of many joints, large one-time investment, time-consuming, etc., to ensure integrity And stability, easy formwork installation, overall stable effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0024] In order to make the objectives, technical solutions and advantages of the present invention clearer, the present invention will be described in further detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention and are not intended to limit the invention.
[0025] The schematic diagram disclosed by the present invention is as Figure 1~5 As shown in the figure, a construction method of a cylindrical frame beam with an outer hoop as a whole, comprising the following steps:
[0026] Step 1, custom template 1: In the construction preparation stage, a semicircular template 1 with a height of 3m and a thickness of 18mm is customized in the factory, and the interface between the templates 1 is provided with grooves to ensure tight joints.
[0027] Step 2, formwork 1 installation: At the place where the steel frame supporting the column needs t...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


