Short-term peak regulation scheduling collaborative optimization method and system for cascade hydropower station group
A cascade hydropower station group and collaborative optimization technology, applied in data processing applications, instruments, artificial life, etc., can solve problems such as low performance and premature convergence
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0104] The feasibility and effectiveness of the method of the present invention are verified by taking the short-term optimal dispatch of cascade hydropower station groups in the Wujiang River Basin as an example. In Example 1 of the present invention, the number of individuals is 150, the maximum number of iterations is 500, the mutation probability is 0.01, the calculation period is set to 1 day, and the constraint destruction penalty coefficient is set to 10 4 .
[0105] Table 1
[0106] method project Peak (MW) Valley (MW) Peak-to-valley difference (MW) Average (MW) variance original result 13477.93 10101.60 3376.33 11910.93 1281.95 GA Optimization Results 11259.51 8020.04 3239.47 9662.40 890.25 reduction 2218.42 2081.56 136.86 2248.53 391.70 promote(%) 16.46 20.61 4.05 18.88 30.56 DE Optimization Results 10586.69 8512.56 2074.13 9649.85 585.83 reduction 2891.24 1589.04 1302.20 226...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com