Multi-cluster management method, device and system and related components

A cluster management and cluster technology, applied in the electronic field, can solve the problems of omission of detection, cumbersome implementation process, low cluster operation and maintenance efficiency, etc., to achieve the effect of improving management efficiency, simplifying process and workload, and ensuring reliability and stability.

Inactive Publication Date: 2019-09-17
SANGFOR TECH INC
View PDF6 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The running status and configuration of each service component of the cluster are distributed on different management pages. The administrator needs to log in to the corresponding cluster master to configure and manage each cluster. For administrators, multiple logins to different cluster masters The process implementation process is relatively cumbersome, resulting in low efficiency of cluster operation and maintenance; and multiple operations are required to detect the operation of each service component, which may lead to detection omissions, resulting in the inability to achieve effective and reliable cluster operation and maintenance

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Multi-cluster management method, device and system and related components
  • Multi-cluster management method, device and system and related components
  • Multi-cluster management method, device and system and related components

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0059] Please refer to figure 2 , figure 2 A flow chart of a multi-cluster management method provided in this embodiment; the method mainly includes:

[0060] Step s110, the management platform sends data acquisition requests to at least two clusters to be managed.

[0061] The management platform sends a data acquisition request to the cluster to be managed through the external interface of the cluster. The data acquisition request is the component status data acquisition request of the cluster host, so that each cluster can collect the corresponding status data and upload it to the management platform for subsequent overall analysis and processing .

[0062] Generally speaking, the management platform needs to send data acquisition requests to all managed clusters in order to realize the management of all clusters. When separate management is required for certain clusters or components under certain clusters, data can only be sent to specified clusters. For obtaining re...

Embodiment 2

[0073] Different from Embodiment 1, this example mainly starts from the perspective of multi-cluster data push rules, and further introduces the page display process under several multi-cluster data push rules on the basis of Embodiment 1.

[0074] When the number of clusters to be managed is large, or the components specified to be collected under different clusters are different, in order to ensure that users can more intuitively understand the status information of components under each cluster, preferably, the status data is pushed according to the preset multi-cluster data The process of page display processing by rules can be implemented according to the following steps:

[0075] 1. Collect the status data corresponding to each cluster in the status data to obtain the cluster status data;

[0076] 2. Visualize the status data of each cluster according to the corresponding cluster display rules.

[0077] When the number of clusters to be managed is limited, and the types...

Embodiment 3

[0082] Due to certain errors that may occur during the collection process or data transmission process, the collected component type is wrong, the data contains unrecognizable parts, and other problems that affect the validity of data reading.

[0083] In order to avoid some problems before the data processing process from affecting the efficiency of the subsequent processing process, preferably, before the state data is displayed on the page according to the preset multi-cluster data push rules, the data validity of the state data can be further checked. test.

[0084] Data validity verification can specifically be data format validity verification, component type validity verification, etc., which can be set according to problems that may occur during actual data collection and transmission. Only these two types of verification are used here The form is introduced as an example, and other verification methods will not be described here.

[0085] Correspondingly, the process...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a multi-cluster management method. According to the method, a management platform sends a data acquisition request to each cluster, when state data pushed by the cluster is received, page display processing is carried out on the state data, and the multi-cluster visual state data obtained through processing are cached, so that a browser client side calls the multi-cluster visual state data to respond to the cluster management request. According to the method, the operation states and configuration conditions of the cluster components are managed in a unified manner, so that an administrator can monitor a plurality of clusters at the same time, the multi-cluster management process and workload are greatly simplified, the multi-cluster operation and maintenance management efficiency is improved, and the multi-cluster operation reliability and stability are further guaranteed. The invention further provides a multi-cluster management device and system, computer equipment and a readable storage medium which have the above beneficial effects.

Description

technical field [0001] The present application relates to the field of electronic technology, and in particular to a multi-cluster management method, device, system, computer equipment and a readable storage medium. Background technique [0002] Multiple node servers form a cluster through a local area network to jointly realize business services. In order to ensure comprehensive management of large-scale businesses, it is usually necessary to set up multiple clusters. When there are multiple clusters in the user's production environment, the cluster administrator needs to manage the running status, resources, and configuration status of all service components in all clusters that affect business reliability. [0003] Currently, multi-cluster management requires an administrator to log in to the master node server through a browser client to manage the cluster. The running status and configuration of each service component of the cluster are distributed on different manage...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): H04L12/24
CPCH04L41/0253H04L41/22
Inventor 胡勇强
Owner SANGFOR TECH INC
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products