Opposite-pulling anchor cable structure for reducing unsymmetrical loading and construction method
A technology of anchor cables and loads, which is applied in basic structure engineering, earthwork drilling, installation of anchor rods, etc., can solve the problems of large number of sewage workers, high cost, and influence on construction progress, and achieves low economic cost, simple construction method, and reduced cost. Effect of Small Bias Loads
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0047] figure 1 It shows the anti-tension anchor cable structure for reducing tunnel bias load of the present invention, which includes: steel pipe piles 1, which are respectively arranged along the tunnel 100 and apply bias to the tunnel 100. In the mountains on both sides of the pressure load, the steel pipe pile 1 is used to reinforce the rock mass of the mountains on both sides along the line before excavation; and the crown beam 2 is arranged on the ground, and the top of the steel pipe pile 1 is fixed in the crown beam 2.
[0048] In this embodiment, parameters such as the diameter, spacing, length, and wall thickness of the steel pipe pile 1 can be determined according to influencing factors such as tunnel burial depth, surrounding rock conditions, groundwater state, and mountain stability, as long as it can ensure that the tunnel on one side of the mountain is stability of the rock mass. Here, the steel pipe pile 1 has a diameter of 50-1000mm (preferably 200-800mm, m...
Embodiment 2
[0070] Such as Figure 10 As shown, the present invention also provides a construction method for reducing the tunnel bias load on the basis of the first embodiment above, which includes the following steps:
[0071] S1, prefabricated steel pipe pile 1;
[0072] S2. Install the steel pipe pile 1 in the mountain body on both sides of the tunnel 100; and perform grouting reinforcement on the surrounding rock mass of the steel pipe pile 1 .
[0073] Specifically, step S2 includes:
[0074] S21, such as Figure 11 As shown, a crown beam 2 is set on the ground, and the top of the steel pipe pile 1 is fixed in the crown beam 2. At the same time, a borehole 308 can also be drilled in advance, and the steel pipe 10 of the steel pipe pile 1 The bottom extends into the pre-drilled borehole, so that the steel pipe pile 1 is arranged in the mountain body on both sides of the tunnel 100;
[0075] S22, the first grouting: pump a small amount of clear water to the bottom of the borehole ...