Tunnel entering construction method for stabilizing mountain under large unsymmetrical pressure terrain
A construction method and mountain technology, applied in tunnels, tunnel linings, underground chambers, etc., can solve problems such as tunnel cracking and deformation, and achieve the effects of controlling mountain deformation, protecting safe construction, and preventing force cracking and deformation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0058] A tunnel entry construction method for stabilizing mountain bodies under large bias terrain, comprising the following steps:
[0059] (1) Foundation and anti-skid treatment
[0060] (1-1) Clear the surface of the mountain with large bias pressure, level the site, and then use the leveled site to drill holes with down-the-hole drilling. During the drilling process, root canal drilling or pre-grouting can be used according to the collapse of the hole post-drilling measures;
[0061] (1-2) Use pressure pouring cement mortar or fine stone concrete to pour into the hole to form anti-slip micro piles;
[0062] (1-3) Remove the pile head not less than 50cm from the top of the anti-sliding micro pile, expose the steel pipe and steel tendon, and lay a layer of steel mesh on the top of the pile head;
[0063] (1-4) Embed the connecting steel bars between the counter-pressure concrete and the cap, and pour the concrete cap;
[0064] (2) Mountain back pressure
[0065] (2-1) Co...