Abutment construction method for carrying out construction and filling in sequence in highfill area

A construction method and high filling technology, applied in bridges, bridge parts, bridge construction, etc., can solve problems such as low efficiency and long construction period, and achieve the effect of simple construction process, guaranteeing construction progress, and shortening construction period.

Active Publication Date: 2019-09-27
ROAD & BRIDGE INT +1
View PDF20 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The purpose of the present invention is to solve the problems of long construction period and low efficiency in the existing construction methods of filling first and then building abutments, and to provide an abutment construction method of first filling and then filling, which shortens the construction time under the premise that the construction quality meets the specification requirements. The construction cycle of the abutment, and provide reference for the construction of similar projects in the future

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Abutment construction method for carrying out construction and filling in sequence in highfill area
  • Abutment construction method for carrying out construction and filling in sequence in highfill area

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0014] The implementation method of the present invention will be described below through a specific embodiment.

[0015] In this embodiment, the abutment is located in the high fill area, and the gravel in the fill area comes from tunnel slag. Due to the small amount of slag discharged from the tunnel every day, it will take a long time to fill the entire filling area to the design height. In order not to affect the construction period of the bridge of this project, it is decided to adopt the construction method of constructing the bridge abutment first, and then discarding the stone slag around the bridge abutment later. The specific implementation method is as follows:

[0016] (1) In this embodiment, there are 6 pile foundations of the abutment, and first, the parts below the surface of the 6 pile foundations are constructed using the ordinary bored pile construction method. Firstly, in the high-fill abutment construction area, clean the surface of the original ground 1, ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides an abutment construction method for carrying out construction and filling in sequence in a highfill area. Firstly, the part below the original ground of a pile foundation is constructed; then, open pile foundation work is adopted for constructing the part above the ground of the pile foundation; after pile foundation construction is completed, reinforced concrete barricades are poured on the periphery of the pile foundation in a layered manner, after pouring of each layer of barricade is completed, gravel is adopted between the barricades and piles for layered filling, each layer of gravel is tamped by a small tamping machine, then one layer of barricade is constructed, gravel backfill is carried out, and operation is circulated in sequence till the designed elevation is achieved; and a bearing table and an abutment body are constructed on filling gravel and the top of the pile foundation. The abutment construction schedule can be greatly improved, and the bridge overall construction period can be guaranteed. In the later period of engineering, rock ballasts are subjected to backfill step by step in the fill area outside the barricades till the designed elevation is achieved so as to guarantee the quality of the fill area.

Description

technical field [0001] The invention belongs to the technical field of bridge construction, and relates to a construction method of a bridge abutment, in particular to an abutment construction method in which the abutment is located in a high fill area and is constructed first and then filled. Background technique [0002] When building bridges in mountainous areas, some abutments are designed in high fill areas, with high fill heights, large fill areas, and a large amount of demand. The traditional abutment construction method is to fill up to the design elevation first, then use the percussion drill to punch holes to construct the pile foundation, and construct the cap and abutment body on the top of the pile foundation. The construction progress of the above method depends on the filling progress. In actual construction, in order to protect the environment, the tunnel excavation construction or subgrade excavation waste slag of the same project is generally used for fill...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E01D21/00E01D19/02E02D27/12
CPCE01D19/02E01D21/00E02D27/12
Inventor 李玲玉陈松洲李志文黄灿吕金明张立爽
Owner ROAD & BRIDGE INT
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More