Construction method for forming hole in follow-up sleeve pile foundation
A construction method and pile foundation technology, which can be used in infrastructure engineering, sheet pile walls, buildings, etc., and can solve problems such as delay in construction period, damage to casing, and drilling offset.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0024] Step 1. Before the construction of the pile foundation, the laser leveling machine is used to level the site where the pile foundation is required to form a flat operation platform. After the construction is completed, the surveyors will accurately measure the placement point to determine the center position of the pile, and Drive the cross pile into the measured position;
[0025] Step 2. At the center of the pile measured in step 1, use a scarifier to loosen the soil at the center. The diameter of the loose soil is 400cm. After the loose soil is completed, use a hoist to bury the casing at the center of the pile ;
[0026] Step 3: In step 2, a noise reduction sleeve is installed on the outer surface above the casing, and a support ring is installed under the inner ring of the noise reduction sleeve. Adjust the hammer suspended by the hoisting machine so that the center hammer The position with the center of the pile is well controlled within 1.5cm;
[0027] Step 4: ...
Embodiment 2
[0032] Step 1. Before the construction of the pile foundation, the laser leveling machine is used to level the site where the pile foundation is required to form a flat operation platform. After the construction is completed, the surveyors will accurately measure the placement point to determine the center position of the pile, and Drive the cross pile into the measured position;
[0033] Step 2. At the center of the pile measured in step 1, use a scarifier to loosen the soil at the center. The diameter of the loose soil is 425cm. After the loose soil is completed, use a hoist to bury the casing at the center of the pile ;
[0034] Step 3: In step 2, a noise reduction sleeve is installed on the outer surface above the casing, and a support ring is installed under the inner ring of the noise reduction sleeve. Adjust the hammer suspended by the hoisting machine so that the center hammer The position with the center of the pile is well controlled within 1.3cm;
[0035] Step 4. ...
Embodiment 3
[0040] Step 1. Before the construction of the pile foundation, the laser leveling machine is used to level the site where the pile foundation is required to form a flat operation platform. After the construction is completed, the surveyors will accurately measure the placement point to determine the center position of the pile, and Drive the cross pile into the measured position;
[0041] Step 2. At the center of the pile measured in step 1, use a scarifier to loosen the soil at the center. The diameter of the loose soil is 450cm. After the loose soil is completed, use a hoist to bury the casing at the center of the pile ;
[0042]Step 3: In step 2, a noise reduction sleeve is installed on the outer surface above the casing, and a support ring is installed under the inner ring of the noise reduction sleeve. Adjust the hammer suspended by the hoisting machine so that the center hammer The position with the center of the pile is well controlled within 1.5cm;
[0043] Step 4. T...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com