A kind of engineering technology, mine pit technology, applied in infrastructure engineering, surface mining, underground mining and other directions, can solve the problems of seepage polluted groundwater, collapse of backfill materials, etc., to achieve the effect of improving stability, good repair effect and ensuring safety
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0046] According to the embodiment of the present invention, a mine pit in Yulin, Shanxi Province is selected for experimentation, wherein a pit diameter of 125 meters and a depth of 40 meters are selected as the experimental pit 1.
[0047] A pit backfill engineering technology is provided, comprising the following steps:
[0048] Step 1: For the stability of the reinforcement mesh arrangement, it is necessary to clean up the unstable deposits on the side slope and bottom of the pit until the stable rock mass layer is cleaned up, and the deposits shall be reserved for later use;
[0049]Step 2: Set a vertical support column at the center of the pit bottom, the vertical support column adopts a cement column, and the vertical support column is fixed by a pile driver. The height of the vertical support column is slightly greater than the depth of the pit, and the vertical support column The lower end extends into the ground and the height is 1 / 4 of the length of the vertical sup...
Embodiment 2
[0064] According to the embodiment of the present invention, the mine pit in Yulin area, Shanxi Province is selected to carry out the experiment, wherein a mine pit with a diameter of 152 meters and a depth of 51 meters is selected as the experimental pit 2, adjacent to the experimental pit 1.
[0065] A pit backfill engineering technology is provided, comprising the following steps:
[0066] Step 1: For the stability of the reinforcement mesh arrangement, it is necessary to clean up the unstable deposits on the side slope and bottom of the pit until the stable rock mass layer is cleaned up, and the deposits shall be reserved for later use;
[0067] Step 2: Set a vertical support column at the center of the pit bottom, the vertical support column adopts a cement column, and the vertical support column is fixed by a pile driver. The height of the vertical support column is slightly greater than the depth of the pit, and the vertical support column The lower end extends into the...
PUM
Property | Measurement | Unit |
---|---|---|
Thickness | aaaaa | aaaaa |
Piercing strength | aaaaa | aaaaa |
Permeability coefficient | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com