Eureka AIR delivers breakthrough ideas for toughest innovation challenges, trusted by R&D personnel around the world.

Construction ventilation method for large and long tunnel

A technology for tunnel construction and ventilation methods, which is applied in mine/tunnel ventilation, earth-moving drilling, mining equipment, etc., can solve the problems of short effective suction range, not too fresh, polluted roadways, etc., to ensure life and health. Safety, reduced convection and vortex, improved ventilation efficiency

Active Publication Date: 2019-10-11
中建四局贵州投资建设有限公司
View PDF4 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The above-mentioned traditional ventilation methods have the following defects: the press-in ventilation requires a huge amount of air during long-distance construction, and the return air will pollute the entire roadway; The fresh air flows through the whole hole and is not very fresh when it reaches the working surface; the construction management of hybrid and roadway ventilation is complicated

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction ventilation method for large and long tunnel
  • Construction ventilation method for large and long tunnel
  • Construction ventilation method for large and long tunnel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0016] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0017] Embodiments of the present invention: a construction ventilation method for large and long tunnels, including the existing tunnel bidirectional excavation construction method, comprising the following steps:

[0018] Step 1, see figure 1 , before the crosswalk 8 between the left hole 1 and the right hole 2 of the tunnel runs through, the tunnel adopts a press-in ventilation method, and a local fan 3 is installed outside the entrance and exit of the left...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction ventilation method for a large and long tunnel. Before the car crossing between the left hole and the right hole of the tunnel is penetrated, the tunnel adopts apress-in ventilation method and the entrances and exits of the left and right holes are externally provided with local ventilators, and the local ventilators can supply air to each face of the tunnelrespectively; meanwhile, in order to ensure the flow stability of the airflow in the tunnel after the crosswalk of the tunnel is penetrated, a jet fan is installed at intervals of the left or right hole of the tunnel to guide the airflow direction and blow off the accumulated gas in a local section. The method provided by the invention fully utilizes the left and right holes and the intermediatecar crossing of the parallel construction, reduces the convection and vortex of the air in the hole by adopting the method of single hole intake and single hole exhaust, improves the ventilation efficiency, and ensures the life health safety of construction worker maximally.

Description

technical field [0001] The invention relates to a construction ventilation method for a large and long tunnel, belonging to the technical field of tunnel ventilation. Background technique [0002] Ventilation methods for tunnel construction are generally push-in type, extraction type, hybrid type and roadway type. The above-mentioned traditional ventilation methods have the following defects: the press-in ventilation requires a huge amount of air during long-distance construction, and the return air will pollute the entire roadway; The fresh air flows through the whole hole and is not very fresh when it reaches the working face; the construction management of hybrid and roadway ventilation is complicated. Contents of the invention [0003] Aiming at the deficiencies of the prior art, the present invention provides a construction ventilation method for large and long tunnels with simple structure, convenient construction and good ventilation effect, so as to overcome the d...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21F1/00E21F1/08
CPCE21F1/003E21F1/08
Inventor 刘函廷张凌国王守钱龙泽鑫石麟张健
Owner 中建四局贵州投资建设有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products