Displaced member correcting process for timber frame building
A wooden frame and building technology, applied in construction, building maintenance, building construction, etc., to reduce construction costs and improve effectiveness
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0018] In this embodiment, a kind of process of striking and pulling out a wooden frame building comprises the following steps:
[0019] S1. First put the building with severe crookedness on the top of the pole to prevent further crookedness and collapse;
[0020] S2. Remove the tile surface, shovel off the mud back, remove the gable, sill wall and other supporting roofs, remove the watchboard and rafters, and expose the large wooden structure;
[0021] S3. Remove the wooden tenons and bayonets at the mortise and tenon joints of the wooden frame, and loosen the iron parts if there are iron parts;
[0022] S4. On the outer skin of the column, add the middle line and ascending line;
[0023] S5, prop up the mast to the opposite direction of the crooked frame, and at the same time, straighten and straighten the frame to make the crooked frame return to normal;
[0024] S6. Stabilize the closing bar and cover the bayonet again, block the eye opening, add iron work, pad the colum...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com