Navigation method for mounting prefabricated components of prefabricated building

A technology of building components and prefabricated components, which can be used in forecasting, computer parts, collaborative devices, etc., and can solve problems such as rework, waste of materials, and easy confusion

CN110348546APending Publication Date: 2019-10-18云南齐星杭萧钢构股份有限公司
3 Cites 1 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Publication Date
2019-10-18
Patent Text Reader

Abstract

The invention discloses a navigation method for installation of prefabricated components of a prefabricated building. The method comprises the following steps: information in RFID tag is transmitted to BIM-RFID system for judgment and processing, and a construction sequence, ca omponent transportation sequence, ta ransportation train number, transportation routes and like are pl are reasonably arranged;, and implementation of zero-defect and zero-inventory idealized targets in lean construction is facilitated. Meanwhile, relevant information such as the actual progress of the construction sitecan also be fed back to a prefabricated part production factory in real time; and the factory adjusts the component production plan according to the fed-back construction site progress information, so that the probability of waiting for work and waiting for materials is almost zero, then the factory transmits the information of the adjustment plan to the construction site, information sharing isachieved, and smooth proceeding of engineering is facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention relates to the field of construction equipment, in particular to a navigation method for the installation of prefabricated components of a prefabricated building. Background technique

[0002] Prefabricated buildings refer to buildings that are assembled on site with factory-prefabricated components. The advantages of this kind of building are that the construction speed is fast, the construction waste is less, and it is less restricted by climatic conditions and saves labor.

[0003] However, due to the wide variety of prefabricated steel components involved in the prefabricated construction process, the large number of project participants, and the scattered information, it is easy to be confused in the process of component prefabrication, transportation, and installation, resulting in errors in information transmission, resulting in rework, waste of materials, and delays in the construction period. .

[0004] For the problems in the ...

Examples

Embodiment Construction

[0021] The technical solutions of the present invention will be clearly and completely described below with reference to the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.

[0022] The embodiment of the present application provides a navigation method for the installation of prefabricated building components, comprising the following steps:

[0023] Build BIM models;

[0024] The establishment of the BIM model is specifically to use BIM software to establish a BIM model of a building component, and input the basic information of the building component;

[0025] The basic information of the building component is name, specification, model, supplier, c...