Supercharge Your Innovation With Domain-Expert AI Agents!

Temporary prestressed tension pedestal and lifting point integrated structure of section beam and construction method of section beam

A technology of tensioning pedestals and prestressing, applied in bridges, bridge materials, bridge construction, etc., can solve problems affecting the integrity of steel bars in segmental beams, increase the workload of channel sealing, and increase the difficulty of segmental beams, etc., to achieve saving The effect of reducing the construction period, reducing the amount of materials, and reducing the workload

Pending Publication Date: 2019-11-19
CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP
View PDF0 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Segmental hoisting holes and temporary tensioning pedestals are usually set separately, which are respectively used for temporary prestressing during segmental hoisting and segmental assembly. More holes need to be reserved on prefabricated segments. These tunnels should be avoided when stressing pipelines. If they cannot be avoided, the steel bars of the segmental beams need to be cut off, and spiral bars or reinforcement meshes need to be set up for local reinforcement, which not only increases the difficulty of segmental beam construction, but also affects the steel bars of segmental beams. Integrity, which increases the workload of the post-hole sealing, if the quality of the hole sealing is poor, it will increase the risk of water seepage on the bridge deck during the later operation period

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Temporary prestressed tension pedestal and lifting point integrated structure of section beam and construction method of section beam
  • Temporary prestressed tension pedestal and lifting point integrated structure of section beam and construction method of section beam
  • Temporary prestressed tension pedestal and lifting point integrated structure of section beam and construction method of section beam

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0029] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0030] Such as Figure 1-4 As shown, as the first embodiment of the present invention, an integrated structure of a segmental beam temporary prestressed tensioning pedestal and a lifting point is provided, which is characterized in that it includes a temporary prestressed tensioning pedestal installed on a segmental beam and The integrated structure of the lifting point, the integrated structure of the temporary prestressed tensioning pedestal and the lifting...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a temporary prestressed tension pedestal and lifting point integrated structure of a section beam and a construction method of the section beam. The integrated structure comprises the temporary prestressed tension pedestal and lifting point integrated structure arranged on the section beam; the temporary prestressed tension pedestal and lifting point integrated structure comprises a bottom plate installed on the section beam, a temporary prestressed tension pedestal mechanism installed on the bottom plate and a lifting hole mechanism installed on the bottom plate; the temporary prestressed tension pedestal mechanism comprises a pair of anchor plates installed on the bottom plate in the direction of a transverse bridge, the lifting hole mechanism comprises a pair ofribbed plates with lifting holes mounted on the bottom plate in the direction of a bridge, the two anchor plates face each other, the two ribbed plates with lifting holes face each other and are located between the two anchor plates, the two ends of the ribbed plates with lifting holes are respectively connected with the anchor plates at the corresponding ends of the ribbed plates with lifting holes, the upper ends of the ribbed plates with lifting holes are provided with the lifting holes in the middle, the lifting holes of the ribbed plates with two lifting holes are opposite to each other,the anchor plates are provided with beam piercing holes penetrated by temporary prestressed twisted steel bars, and the beam piercing holes on the two anchor plates are opposite each other.

Description

technical field [0001] The invention relates to the field of segmental beams, in particular to an integrated structure and construction method of a temporary prestressed tensioning pedestal and a lifting point of a segmental beam. Background technique [0002] In the process of modern bridge construction, segmental prefabricated assembly technology has been more and more applied and promoted due to its advantages of economy, high efficiency and environmental protection. The prefabricated segments are manufactured in the prefabrication yard, and later transported to the bridge site for assembly. The assembly process includes multiple processes such as lifting, trial assembly, application of epoxy resin glue, tensioning temporary prestressing, through holes, tensioning permanent prestressing, and pipe grouting. After the epoxy glue is applied to the segment, a certain temporary pre-pressure needs to be applied to the glue joint to make the epoxy glue solidify under pressure. ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E01D21/00E01D101/28
CPCE01D21/00E01D2101/28
Inventor 杜振华高文军董传新曾敏彭士祥徐领
Owner CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More