Method for judging temporary plugging times of segmented multi-cluster fracturing wellbores of directional well and horizontal well

A technology for fracturing wells and directional wells, which is applied in the field of judging the number of temporary plugging times of multi-cluster fracturing wellbore in directional wells and horizontal wells
CN110580401AActive Publication Date: 2019-12-17SOUTHWEST PETROLEUM UNIV

Patent Information

Authority / Receiving Office
CN Β· China
Current Assignee / Owner
SOUTHWEST PETROLEUM UNIV
Publication Date
2019-12-17

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention discloses a method for judging the temporary plugging times of a segmented multi-cluster fracturing wellbore of a directional well and a horizontal well. The method for the directional well comprises the following steps: building a physical model of fracture initiation of the wellbore of the directional well; establishing a corresponding stress mathematical model; calculating the fracture pressure during fracture initiation; determining the fracture initiation number by utilizing a current limiting principle; subtracting 1 from the ratio of the designed perforation cluster numberto the fracture initiation number by adopting a ceil method to obtain a temporary plugging time; the method for the horizontal well comprises the following steps: obtaining rock mechanical parameters; establishing a dynamic and static relation model of rock mechanics parameters; calculating a tectonic stress coefficient; calculating the minimum horizontal principal stress and the maximum horizontal principal stress; calculating the fracture pressure during fracture initiation; determining the fracture initiation number by utilizing a current limiting principle; subtracting 1 from the ratio ofthe designed perforation cluster number to the fracture initiation number by adopting a ceil method to obtain the temporary plugging times. According to the method, the temporary plugging times of the segmented multi-cluster fracturing wellbores of the directional well and the horizontal well can be accurately judged.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention belongs to the technical field of petroleum and natural gas exploitation, and in particular relates to a method for judging the number of times of temporary blockage of multi-cluster fracturing well bores in directional wells and horizontal wells. Background technique

[0002] Temporary plugging is mainly aimed at shale reservoirs. Shale gas is an important part of unconventional oil and gas resources. Its special storage mode and reservoir structure provide a way to break up reservoirs, increase SRV (effectively stimulated volume), and greatly increase High-permeability passages are used to increase production, and horizontal well segmented multi-cluster fracturing technology can meet the above-mentioned modification requirements. Therefore, horizontal well segmented multi-cluster fracturing has become the main development method for shale gas stimulation.

[0003] With the development of shale gas exploration and development, from the p...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More